Okla. Admin. Code § 252:515-3-56 - Site map
(a)
Required map. The permit application shall include a site map, which may be the existing contour map.
(b)
Required details. The site map shall show the following, as applicable to the facility:
(1) the dimensions of the permit boundary as indicated by legal description;
(2) the receiving processing, storage or disposal areas;
(3) buffer zones;
(4) the locations and surface elevations of each borehole, monitor well, test well, monitoring site, test pit, sampling site and permanent benchmarks;
(5) the surface and top of casing elevations for each monitoring well or gas probe;
(6) the surface drainage, including location of diversion ditches, dikes, dams, pits, ponds, lagoons, berms, terraces and other relevant information;
(7) the location of fencing and gates, utility lines, pipelines, and easements;
(8) the access roads into and on the site;
(9) employee and equipment shelters; and
(10) on- and off-site soil borrow areas.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.