Okla. Admin. Code § 252:641-3-4 - Soil profile description
(a)
Test hole requirements. Test holes may be augered borings,
continuous core borings, or excavated pits.
(1)
Borings. If borings are
used, three test holes shall be placed in the proposed dispersal site at the
approximate corners of an isosceles triangle having two (2) sides fifty feet
(50') long and one side seventy-five feet (75') long. If the dispersal field
will cover an area larger than ten thousand square feet (10,000
ft2), then one additional test hole shall be used
for each additional five thousand square feet (5,000
ft2). Additional test holes shall not be placed
within fifty feet of any other test hole and shall be located between fifty to
seventy-five feet (50-75') from one of the other test holes. The DEQ may
approve or require alternative configurations. Borings shall allow for the
classification of the soil in six-inch intervals and shall be bored to a
minimum depth of forty-eight inches (48") or until one of the following is
encountered first:
(A) a layer that is
impervious to boring;
(B) a
six-inch interval classified as a Group 5 soil; or
(C) water saturated soil .
(2)
Pits. If
excavated pits are used, three (3) pits shall be placed in the proposed
dispersal site at the approximate corners of an isosceles triangle having two
(2) sides fifty feet (50') long and one side seventy-five feet (75') long. If
the dispersal field will cover an area larger than ten thousand square feet
(10,000 ft2), then one additional test hole shall be
used for each additional five thousand square feet (5,000
ft2). Additional test holes shall not be placed
within fifty feet of any other test hole and shall be located between fifty to
seventy-five feet (50'-75') from one of the other test holes. The DEQ may
approve or require alternative configurations. Pits shall:
(A) have a depth of a minimum of forty-eight
inches (48"), unless rock or water saturated soil is encountered at a shallower
depth;
(B) be a minimum of
thirty-six inches (36") wide and sixty inches (60") long; and
(C) have one end sloped or stepped to allow
for entry.
(b)
Identification of limiting
layers. The shallowest limiting layer encountered in the test holes
shall be the limiting layer for the entire dispersal site . The following are
considered limiting layers and shall be identified by depth on DEQ Form
641-581, "Report for On-Site Sewage Treatment:"
(1) a layer that is impervious to
boring;
(2) a six-inch interval
classified as a Group 5 soil; and
(3) water saturated soil .
(c)
Verifying limiting
layers using pits. Limiting layers may be verified using an excavated
pit. The results of the pit(s) shall override the results of borings completed
in the same proposed dispersal site .
(d)
Classifying soil intervals.
For each test hole, the soil group for each six-inch interval between the
surface and the bottom of the test hole shall be identified using the
guidelines found in the "DEQ /OSU Soil Classification Manual" and classified as
one of the soil groups in Appendix B.
(e)
Determining the soil group for the
separation range. The soil group for the separation range establishes
the required vertical separation between the dispersed effluent and the
limiting layer. The separation range consists of the three (3) six-inch
intervals above the interval containing a limiting layer or, if no limiting
layer was identified, the separation range shall be the three (3) six-inch
intervals above the bottom of the test hole. To determine the soil group for
the separation range:
(1) Select the test hole
in the dispersal site with the lowest clay content in the separation range;
and
(2) Identify and record the
most prevalent soil group in the separation range for that test hole.
(f)
Identifying dispersal
field options. Based on the soil group identified in (e) of this
Section, use Appendix A, Figure 1 to identify suitable dispersal fields along
with their minimum separations distances from the limiting layer.
(g)
Sizing the dispersal
field(s). Each suitable dispersal field shall be sized as follows:
(1)
Determining sizing range.
Select the test hole in the dispersal site with the highest clay content in the
sizing range for the chosen dispersal field. The applicable sizing range for
each type of dispersal field is as follows:
(A)
Conventional subsurface absorption
fields. The sizing range for conventional subsurface absorption fields
is the three (3) six-inch intervals between twelve inches (12") and thirty
inches (30").
(B)
ET/A
fields. The sizing range for ET/A fields is the three (3) six-inch
intervals between twelve inches (12") and thirty inches (30").
(C)
Shallow extended subsurface
absorption fields. The sizing range for shallow extended subsurface
absorption fields is the three (3) six-inch intervals between six inches (6")
and twenty-four inches (24").
(D)
Drip irrigation fields. The sizing range for drip irrigation
fields is the three (3) six-inch intervals between ground level and eighteen
inches (18").
(E)
Spray
irrigation fields. The sizing range for spray irrigation fields is the
three (3) six-inch intervals between ground level and eighteen inches
(18").
(2)
Identifying soil group in sizing range. Determine the most
prevalent soil group in the sizing range for the test hole selected in (1) of
this subsection;
(3)
Sizing
dispersal field. Based on the soil group identified in (2) of this
subsection, size the dispersal field using the charts in Appendix H, Figures
2-4 and 6-19; and
(4)
Sizing
additional dispersal field options. Repeat (1) through (3) of this
subsection for each dispersal field option.
(h)
Information to be reported.
After completion of the soil profile, the soil profiler shall submit an
accurate, completed DEQ Form 641-581SP to the local DEQ office.