Okla. Admin. Code tit. 165, ch. 60, subch. 5 - Criteria for EAS/WACP Arrangement [Revoked]
- § 165:60-5-1 - Procedures for initiating cost, engineering and rate design studies [REVOKED]
- § 165:60-5-2 - Procedures for conducting traffic studies [REVOKED]
- § 165:60-5-3 - Determination of adequacy of traffic to meet criteria [REVOKED]
- § 165:60-5-4 - Determination of costs, engineering, and rate design [REVOKED]
- § 165:60-5-5 - Polling of affected subscribers [REVOKED]
- § 165:60-5-5.1 - Technical conference [REVOKED]
- § 165:60-5-5.2 - Initial hearing before the Commission [REVOKED]
- § 165:60-5-6 - Hearing before the Commission en banc; Commission determination [REVOKED]
- § 165:60-5-6.1 - Polling of affected customers [REVOKED]
- § 165:60-5-7 - Final Hearing before the Commission en banc [REVOKED]
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.