Or. Admin. Code § 123-043-0095 - Recipient Responsibilities
(1) The
municipality must comply with all applicable state laws, regulations and
requirements, such as Oregon prevailing wage rates, municipal audit law, and
procurement regulations.
(2) The
municipality shall certify that a registered professional engineer will be
responsible for the design and construction of the project and it shall follow
standard construction practices, such as bonding of engineers and contractors,
requiring errors and omissions insurance, performing testing and inspections
during construction, and obtaining as-built drawings.
(3) For a project funded with state lottery
proceeds, the municipality shall comply with ORS 280.518 for public display of
information on lottery funding of the project. At a minimum the municipality
shall:
(a) Include the following statement,
prominently placed, on all plans, reports, bid documents and advertisements
relating to the Project: "This project was funded in part with a financial
award from the Water Fund, funded by the Oregon State Lottery and administered
by the State of Oregon, Business Development Department." and
(b) For a construction project, post a sign,
provided by the Authority, at the project site or, if more than one site is
included in the project, at a site visible to the general public stating that
the project is being funded by lottery proceeds.
(4) For a construction project the
municipality shall have a plan for ongoing operation, maintenance, and
replacement that will preserve the project's benefits over its useful
life.
Notes
Statutory/Other Authority: ORS 285B.563 & 285A.075
Statutes/Other Implemented: ORS 285B.560 - 285B.599
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.