Or. Admin. Code § 123-046-0060 - Tide Gate Construction Project Application Eligibility Criteria
The Department will determine tide gate construction project application eligibility using criteria including but not limited to the following:
(1) The application must
demonstrate shovel readiness including:
(a)
Completion of all technical and engineering design work;
(b) Completion of all permitting and
regulatory processes unless progress at time of application is adequate to
proceed to construction as determined by the Department; and
(c) Evidence that all landowners on whose
land tide gate drainage infrastructure will be constructed are aware of, and
agree to, the proposal.
(2) Unless otherwise approved under OAR
123-046-0120(1)(a), the application must include feasibility documentation
stamped and signed by an engineer licensed in the State of Oregon. Unless
otherwise approved by the Department, feasibility documentation must include
the following elements:
(a) Analyses of
project feasibility including but not limited to engineering, regulatory, and
legal feasibility;
(b) Analyses of
project alternatives and the recommended option;
(c) Estimate of project costs including
materials, labor, contingency budget, and other expenses;
(d) Construction timeline; and
(e) Operational feasibility analysis
including identification of a plan for operation and maintenance of the tide
gate drainage system.
(3) Application must demonstrate that
authorized access exists for all properties on which construction activities
will occur or equipment will be mobilized.
Notes
Statutory/Other Authority: ORS 285A.075 & Ch 10, OL 2020
Statutes/Other Implemented: Ch 10, OL 2020