Or. Admin. Code § 123-051-0750 - Special Conditions
(1) If the
building is located in an identified tsunami inundation zone the applicant
shall consult with the State Department of Geology and Mineral Industries for
assistance in determining the impact of possible tsunamis on the proposed
project and for assistance in preparing methods to mitigate risk at the site of
a potential tsunami. Consultation shall take place prior to submittal of the
grant application. Proof of the consultation must be included with the
application packet submitted for the project.
(2) If the building is located in the 100
year flood zone, additional engineering review may be required.
Notes
Statutory/Other Authority: ORS 285A.093, 285A.098, 401.910 & OL Ch. 782 2013
Statutes/Other Implemented: ORS 285A.093, 285A.098 & 401.910
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.