Or. Admin. Code § 123-475-0040 - Exclusions
Appropriations for the
(1) Reproductions, by mechanical or other
means, of original Works of Art .
(2) Decorative, ornamental, or functional
elements that are designed by the Architect or consultants engaged by the
Architect , as opposed to an Artist commissioned for this purpose.
(3) "Art objects" which are mass produced of
standard design.
(4) Directional or
other functional elements such as supergraphics, signage, color coding, maps,
or other similar elements, except where an Artist is employed to produce them
and has primary creative control over the Final Art.
(5) Those items which are required to fulfill
the basic purpose of the Resident Agency . Examples would be works of art in the
collection of a state museum, or Works of Art fulfilling an interpretive or
educational role in a state park, the state library, or a college or university
art museum or gallery.
(6)
Preparation of the site necessary to receive the Work of Art, including, but
not limited to, structural reinforcement, landscaping and utility service to
the site, except to the extent the Work of Art is integrated into the structure
or site and costs related to construction budget. Any such inclusion of costs
for the Work of Art in the construction budget or costs of site preparation
included in the art budget must be negotiated among the Designated Agencies and
approved by the Oregon Arts Commission.
(7) Energy and water costs for operation of
electrical and mechanical systems.
Notes
Stat. Auth.: ORS 359.025359.142
Stats. Implemented: ORS 276 .073 - 276 .090
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.