Or. Admin. Code § 123-475-0050 - Responsibilities
(1) The Oregon Arts
Commission shall:
(a) In consultation with
the Designated Agencies , be responsible for selection, reviewing of design,
execution, placement and acceptance of Works of Art ", acquired under the
Program ;
(b) Appoint the members of
the Selection Committee to carry out the functions described in OAR
123-475-0015;
(c) Assist the
Contracting Agency in contract negotiations with artists;
(d) In consultation with the Resident Agency
and Contracting Agency , may transfer Works of Art between public buildings as
provided in OAR 123-475-0080;
(e)
With the help of professionals, install portable Works of Art and re-hang or
relocate Works of Art when it determines such actions are necessary;
(f) In partnership with the Resident Agency ,
advise regarding necessary maintenance procedures in accordance with the Oregon
Arts Commission's Collection Management System.
(g) Maintain complete records and
documentation of the collection with the assistance of the Contracting
Agency ;
(h) Coordinate public
information aspects of the project .
(2) The Contracting Agency shall:
(a) Assist the Oregon Arts Commission with
identifying new Projects subject to ORS 276 .073 - 276.090, and shall notify
the Oregon Arts Commission when construction budgets are approved and funds are
available.
(b) Contract with the
Architect for administrative or design services, or both, to be rendered in
connection with the commissioning of Works of Art , notify the Architect of the
state law requiring a non-deductible allocation for Works of Art and that the
Architect will be a member of and must work closely with the Selection
Committee for the Project and with the Artist , and include in its contract with
the Architect clauses providing for the Architect 's compliance with these
rules, including without limitation as provided in section (3) of this
rule;
(c) Notify the Oregon Arts
Commission of the Project details;
(d) Consult with the Oregon Arts Commission
and Screening Committee on the determination of budget and selection
procedures;
(e) See that payment is
made for all costs, professional fees, purchases and commissions in accordance
with all applicable law;
(f)
Communicate with the Oregon Arts Commission on Project coordination to assure
timeliness of completion of the project ;
(g) Contract with the Artist for procurement
of Works of Art , including without limitation providing for title to the Works
of Art to best in the Contracting Agency or Resident Agency in the name of the
state no later than upon completion of installation of the Works of
Art .
(h) Together with the Resident
Agency , be responsible for security and general maintenance of the Works of
Art , including without limitation observing if the Work of Art is in good
condition, hanging straight, needs dusting, if labels are missing, or if other
measures for security or maintenance are necessary or advisable;
(i) Assist the Oregon Arts Commission with
public information aspects of the Project ;
(j) Review and authorize all changes proposed
involving cost, time, or scope before any changes are made to the Work(s) or
Art for the Project ;
(k) Assist the
Oregon Arts Commission with maintaining an Art Inventory and immediately notify
the Oregon Arts Commission if a work needs repair or is missing.
(3) The Architect shall:
(a) Recommend to the Arts Commission and the
Contracting Agency specific sites for Works of Art and the scale and type of
work thought to be most appropriate;
(b) Act as a member of the Selection
Committee;
(c) Work closely with
the Artist where required, provide engineering information as it pertains to
the building structure and technical assistance to the Artist if requested, and
shall supervise the delivery and installation of the Work of Art under contract
with the Contracting Agency ;
(d)
Ensure that all service requirements for the Work of Art are met in the design
documents and that the Work of Art may be installed with relative
ease.
(4) The Artist
shall:
(a) When commissioned by the
Contracting Agency to create a Work of Art, execute and complete the Work of
Art in a timely and professional manner.
(b) Maintain close contact with the
Contracting Agency to assist with Project coordination before and during
installation;
(c) Transfer title of
newly created or an existing Work of Art to the Contracting Agency ;
(d) Deal personally with the other parties in
all phases of the negotiations. However, the Artists may designate dealers or
other agents to represent them in negotiations;
(e) Maintain a close working relationship
with the Architect on commissioned pieces;
(f) Submit all plans drawings, detailed
proposals and other required materials related to a proposed Work of Art to the
Oregon Arts Commission. All preparatory work remains the property of the Oregon
Arts Commission until the final Work of Art is installed, at which time
ownership of the preparatory materials reverts to the artist ;
(g) Copyright: The artist retains those
rights specified in ORS 359.355 unless contract indicates otherwise.
Notes
Stat. Auth.: ORS 359.025; 359.142
Stats. Implemented: ORS 276 .073 - 276 .090
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.