Or. Admin. Code § 141-075-0035 - Environmental Protection
(1) The
Division must consider alternative actions that will minimize adverse impacts
and both the long and short range implications to man, his physical and social
surroundings, and to nature, in order to avoid or minimize to the fullest
practicable extent all undesirable consequences for the environment.
Environmental impact assessment parallels and is concurrent with the process by
which alternative means are developed to meet objectives based on expressed
needs.
(2) Therefore, the Division
will require an environmental impact assessment which documents the factors
considered by the applicant in his formulation of the geothermal project for
which a state lease is required. Lease terms subsequently submitted to the
applicant will include the specific environmental protections deemed necessary
by the Division in concurrence with the state agency holding jurisdiction over
surface rights.
Notes
Stat. Auth.: ORS 273
Stats. Implemented: ORS 273 .045, ORS 273 .551 & ORS 273 .780
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.