Or. Admin. Code § 141-075-0295 - Requirements After Discovery
Upon making an initial geothermal discovery, the lessee shall:
(1) Submit a proposed testing
program to the Division of State Lands. The Director may require amendments to
the testing program by written notice to the lessee within 30 days following
receipt of the submission.
(2)
Proceed to obtain legal confirmation of the well's primary purpose, i.e.
geothermal production.
(3) The
lessee shall provide certified copies of all tests and measurements made in
conjunction with the testing program. If the Director finds the tests, as
performed, or the data therefrom are not adequate to evaluate the geothermal
resource, he may require other tests to be made, consistent with the usual
operating practices of the geothermal industry.
Notes
Stat. Auth.: ORS 273
Stats. Implemented: ORS 273 .045, ORS 273 .551 & ORS 273 .780