Or. Admin. Code § 141-089-0823 - Non-motorized In-stream Placer Mining within ESH - Definitions
For the purposes of OAR 141-089-0820 through 141-089-0835, the following definitions are used in addition to those found in ORS 196.600 to 196.990 and OAR 141-085-0510.
(1) "Completion of the
activity" means the responsible party will not return or has not returned to
the activity location to resume the activity within 24 hours.
(2) "Gravity Dredge" means a device with a
suction nozzle and hose for conveyance of streambed material for which suction
is created by gravity. A gravity dredge does not have an auxiliary power
source.
(3) "Motorized Equipment"
means equipment or devices powered by internal combustion, hydraulics,
pneumatics, electricity, or mechanical means.
(4) "In-stream" means below the ordinary high
water line of a stream and within the wet perimeter and any adjacent
non-vegetated dry gravel bar.
(5)
"Placer Mining" means to search or explore for samples of gold, silver or other
precious metals by removing, filling or moving material from or within the bed
of a stream.
(6) "Siphon Dredge"
means a device with a suction nozzle and hose for conveyance of streambed
material for which suction is created by siphon action. A siphon dredge does
not have an auxiliary power source.
Notes
Statutory/Other Authority: ORS 196.600-196.692 & 196.795-196.990
Statutes/Other Implemented: ORS 196.600-196.692, 196.795-196.990 & SB 3
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.