Or. Admin. Code § 141-093-0310 - Certain Ocean Renewable Energy Facilities - GP- Specific Conditions
(1) All
requirements, procedures and conditions set forth in OAR 141-093-135 (General
Conditions) apply to this General Permit, except as follows:
(a) General Condition (5) ODFW Fish Passage
Requirement;
(b) General Condition
(8) Pre-Construction Resource Area Fencing or Flagging;
(c) General Condition (9) Erosion Control
Methods; and
(d) General Condition
(11) Raising or Redirecting Water
(2) Notwithstanding the provisions of ORS
274.879(8),
the authorization holder must complete the removal of all equipment related to
the ocean renewable energy facility within the term of the authorization, not
to exceed five years, unless an individual removal-fill permit, pursuant to
141-085 has been issued for extended or expanded ocean renewable energy
facility placement.
(3) Anchors,
cables or any other equipment that lies at least one (1) meter beneath the
ocean floor may be decommissioned in-place if:
(a) There is a recommendation from the JART
to allow specified equipment to be decommissioned in-place; and,
(b) The authorization expressly allows
specified equipment to be decommissioned in-place.
(3) Authorized facilities must contain fish
screens as required by ODFW on any water intake or discharge devices associated
with the ocean renewable energy facility.
(4) Any cables, pipes or other conduit
extending to the ocean shore must be placed consistent with Part Four of the
Territorial Sea Plan.
(5) Required
notifications. The authorization holder must submit to the Department:
(a) For any approved decommissioning of
equipment in-place, a letter verifying that the equipment is buried at least
one (1) meter beneath the ocean floor. The letter must include a description of
methods used to verify the burial depth of the equipment. This verification
letter is due to the Department no later than 90 days prior to the initiation
of facility decommissioning.
(b) A
letter verifying the removal of all ocean renewable energy facility components
(excluding any equipment authorized to be decommissioned in-place. This
verification letter is due to the Department within 30 days of completing the
removal.
(c) Notification of any
observed sinking or disconnection of floating components, substantive movement
of anchors from the point of placement, entanglement of fishing gear, any
release of fluids or any exposure of any buried components. Notification is
required within 24 hours of observance and must include a corrective action
plan.
Notes
Statutory/Other Authority: ORS Chapter 183, ORS 196.810, ORS 196.817, ORS 196.485(3), ORS 197.180 & ORS 196.405-583
Statutes/Other Implemented: ORS 196.600-692 & ORS 196.795-990