Or. Admin. Code § 250-014-0003 - Boating Facility Grant Program
(1) Program Description:
(a) The Board is authorized by ORS
830.150(2)(a) to provide funds for the construction, rehabilitation, and
replacement of boating facilities. The program can provide for the acquisition
of property and related development projects such as ramps, parking, potable
water, sanitation, docks, and other facilities for the convenience and safety
of recreational boaters. The Board may adopt other policies, guidelines, and
procedure manuals as necessary to implement these rules. The funds are
available to eligible participants on a full grant or matching basis.
Applicants are strongly encouraged to provide some form of matching funds. This
will enhance a project's potential for funding. The applicant's match may be a
hard match of cash or a soft match of "in-kind" materials or services such as
project administration, design, engineering, force-account labor and permit
fees specifically related to the Boating Facility Grant as set forth in the
Procedure Guide. Eligible permit fees include application fees for US Army
Corps of Engineers and Department of State Lands section 404 and section 10
permits, other state and local government permit fees required for construction
or other activities associated with the grant, but not system development
charges, impact fees, and general government overhead charges, or waterway
leases and licenses associated with ownership of property.
(b) In granting funds, ORS 830.150(2)(a),
requires the Board to give first priority to applications for facilities
designed to control water pollution or otherwise enhance water quality,
including but not limited to, pumping stations for recreational boat holding
tanks, and to those other facilities for which there appears the greatest
public need. Funds may also be granted for removal of obsolete and abandoned
dock or mooring facilities, if these constitute a boating or navigational
hazard.
(c) Applications for grants
may be submitted by:
(A) Cities;
(B) Counties;
(C) Park and Recreation Districts;
(D) Port Districts;
(E) State Agencies; and
(F) Federal Agency participants such as U.S.
Forest Service, Bureau of Land Management and the Corps of Engineers.
(d) Prior to issuing any grant,
the Board shall hold a public hearing in the area where a facility is to be
constructed or land acquired if, in the judgment of the Board, use of the
facility would stimulate significant change in the character of the
recreational use of the waters.
(e)
Cities, counties, park and recreation districts, port districts, and state or
federal agencies that have developed long-range plans for development of
boating facilities are encouraged to file a copy with the State Marine
Board.
(2) Procedures:
(a) Pre-Application: Prior to submitting an
application for a Marine Board boating facility grant, the applicant should
contact the Marine Board for a pre-application conference to discuss the
proposed project. This will provide applicants with an opportunity to ask any
questions regarding the grant program, and will permit the Marine Board staff
to assist the applicant in the early planning stages of a project. Requests for
application forms, guidance, and assistance may be obtained from: Boating
Facilities Section, Oregon State Marine Board.
(b) Application: When an applicant for a
grant has completed the planning phase, application shall be made to the Board
on such forms as described in the Procedure Guide. A complete application must
include the following enclosures:
(A)
Completed original application form.
(B) A resolution or statement from the
governing body authorizing the project.
(C) Certification from the local city or
county planning agency that the project is in compliance with local
comprehensive plans and zoning ordinances or not subject to local plans and
ordinances.
(D) The following
supporting documents must be submitted:
(i)
Location map of the city or county, showing geographic reference location of
the project.
(ii) A vicinity map
showing the entire facility, boundaries, geographical features and land use
adjacent to the project.
(iii) A
site plan showing the area to be developed with this grant. All items should be
clearly labeled on the plan as existing or proposed development. The plan
should show appropriate dimensions to scale.
(iv) Photographs of the existing project
site. These should be sufficient to show major site features and any special
characteristics. (An aerial photo is desirable if available).
(v) A preliminary cost estimate, with
calculations and quantities, including all proposed facilities and work tasks.
Where marine facilities are only a portion of the total project cost, indicate
the boating related facilities to be developed with Marine Board
funds.
(vi) Preliminary Plans of
all proposed structures, including a plan view (top) and elevation view (side)
of each proposed structure.
(vii)
Third Party Agreements including copies of leases, special use permits, or
intergovernmental agreements if the applicant manages but does not own the
project site. If applicable, a cooperative agreement between the eligible
applicant and a third party participant outlining scope and nature of the
project should be included.
(viii)
A description and chronology of notice given to the public of the application
or proposed project and the opportunities for public input and the comments
received.
(E) If lands
are to be acquired, complete information pertaining to description, present
ownership, appraised value, etc. is required.
(F) For all applications, a brief
Environmental Checklist describing the anticipated environmental impacts of the
project is required.
(G) For
certain projects, various regulatory permits, leases, licenses, certifications,
and plan reviews must be obtained. It is the responsibility of the applicant to
secure the necessary clearances prior to implementing any project. The
applicant shall indicate to the Board the status of any such permits, etc., as
part of its application.
(H) The
Board will not consider incomplete applications.
(c) Notice to Applicants: Following Board
consideration, the applicant shall be advised in writing of the Board's
decision. If a denial is made based on the protection of water quality,
specific notice shall be provided indicating the point or points of the plan
which are inadequate ORS 830.150(4).
(d) Approval of Boating Facility Grant: In
order to approve a Boating Facility Grant, the Board shall assure that the
project complies with the statewide planning goals and is compatible with
applicable acknowledged comprehensive plans by following the procedures set out
in the Board's state agency coordination program adopted pursuant to ORS
197.180.
(e) Approved Boating
Facility Grants: Following Board approval of a Boating Facility Grant, a
special cooperative agreement shall be entered into between the applicant and
the Board. This agreement shall describe the responsibilities of both
participants. Failure by the applicant to execute the grant agreement within 90
calendar days of project approval by the Board may result in the cancellation
of the Boating Facility Grant.
(f)
Completion and Final Reimbursement: Upon completion of the project, the sponsor
shall notify the Board. A final billing with cost documentation shall be
provided to the Board. After a satisfactory review of billing documents and
final inspection by Marine Board staff, final reimbursement will be
authorized.
(g) Boating Facilities
Grant Procedure Guide: The Procedure Guide, adopted by the Board shall set
forth policies, application form, billing form and sample cooperative agreement
for use by all eligible participants.
(h) Boating Facility Grant Availability:
Boating Facility Grants are available each biennial period as prescribed by the
Board. Large projects may be phased in over a period of years or bienniums to
maximize leverage, distribution and availability of funds. Notice of grant fund
availability will be given once to all interested applicants on or about
February 15 for the ensuing new biennial period.
(3) Priorities:
(a) The Board shall provide grants for
boating facilities as the need for facilities appear to the Board as authorized
by ORS 830.150(1).
(b) Since
funding for the program is derived from boat registration fees and state
motorboat gas tax, the highest priorities will go to projects that serve
registered motorboats and sailboats.
(c) When applications for grants exceed funds
available, the Marine Board will, pursuant to ORS 830.150(2), consider the
results of the Boating Survey conducted in accordance with ORS 830.115 in
determining areas of greatest need. The Statewide Six Year Boating Facilities
Plan, prepared under ORS 830.110(6), with input from cities, counties, park
districts, port districts, state and federal agencies, shall also be used to
guide the allocation of funds to priority needs.
(d) The Board in its Procedure Guide shall
prescribe specific ranking criteria for grant applications. The Board may
convene an advisory committee to assist in the review grant project
requests.
(4) Policies:
(a) It is the policy of the Board to
encourage applicants to make use of matching funds. As a part of this policy,
applicants will be encouraged to seek other sources of matching monies or
provide some form of local matching contribution. This local matching
contribution may be a "hard" match of cash and a "soft" match of "in-kind"
materials or services such as project administration, design, engineering,
force account labor, and permit fees specifically related to the Boating
Facility Grant. The Board recognizes that, in some instances, this local
matching contribution may be beyond the applicant's capabilities. In such
cases, the Board may provide a grant covering the full eligible costs. The
availability of matching funds or local participation, while not the primary
factor in considering a grant application will be examined as one aspect of the
project in the decision-making process. The Board in its Procedure Guides shall
develop a general policy on applicant matching funds.
(b) Grants will be limited to actual
certified expenditures for materials, equipment, labor, and services directly
related to construction. Applicants are encouraged to supply "in-house"
administration, labor, equipment and services as a form of match to the Marine
Board grant. "In-kind" participation shall be documented to the maximum extent
possible.
(c) The Board requires
project sponsors to place a credit sign at facilities developed with a Marine
Board grant. This sign shall indicate that the facility was developed with
assistance from the Marine Board. The credit sign shall also recognize grant
funding received through the U.S. Fish & Wildlife Services Clean Vessel
Act, Boating Infrastructure, or Sport Fish Restoration programs, or other
funding sources as appropriate. The cost of design, fabrication and
installation is an eligible cost and may be included in the construction
contract. The sponsor shall place the required sign in a suitable location at
the facility.
(d) In determining
approval of the grants, the Board will give priority to those facilities
providing free services to the general public.
(e) Marine Board staff will, within budgetary
limitations, inspect each proposed facility site with the grant applicant prior
to Board consideration of any grant. On-site visits shall be made to assure
that the facts presented in the application are correct and to furnish Board
members such additional data as may be desired. A final inspection will, within
budgetary limitations, also be made prior to the final grant
reimbursement.
(f) Grant
applications must be received 30 calendar days or more prior to scheduled State
Marine Board meetings to be considered by the Board. Applicants should contact
the Boating Facilities Section Manager concerning grant application deadlines
and availability of funds.
(g) It
is the policy of the Board to require that projects be completed within a
biennial budget period or less from the date of grant approval. Exceptions may
be allowed by the Director if warranted by extraordinary circumstances. The
Director is authorized to approve project time extensions up to 90 days,
provided this is reported to the Board or as provided by state rule.
(h) Partial reimbursement can be made based
upon percentage of project completion with submittal of appropriate
documentation (invoices, receipts, photographs, etc.). Final reimbursement will
be forwarded upon receipt and approval of appropriate final billing
documentation, and a satisfactory final inspection by Board staff. Project
sponsors must inform the staff of any alterations to the project, and should
provide an early indication of any possible cost overruns or delays which will
necessitate a time extension beyond the two year limit.
(i) Except as provided in the Consent Agenda
Grant Consideration Policy applicants shall attend the Marine Board meeting at
which their facility grant request is being considered. The Marine Board staff
shall inform applicants as to the date, time, and location of the Board
meeting. Failure to appear at the meeting may result in a deferral of the grant
request. The Director may waive this requirement for smaller projects or if
special conditions prevent the applicant from being present.
(j) Reimbursement will not be made for
projects initiated or completed prior to approval by the Board and federal
granting agency. Recognizing that emergencies may arise necessitating quick
action, applicants with emergencies should contact the Boating Facilities
Section Manager for instructions before initiating any improvements.
(k) Grants will not be approved for the
routine maintenance of facilities (e.g., cleaning, litter pickup, lawn care,
painting, etc.). These items may be eligible for funding through the
Maintenance Assistance Program.
(l)
The Director is authorized to approve minor cost overruns (less than $10,000).
Applicants must notify the Board of possible cost overruns prior to incurring
them in order to be eligible for possible reimbursement.
(m) In submitting the Grant Application and
by execution of the Cooperative Grant Agreement the Applicant certifies that
all developments will occur on property owned, leased or controlled by
Applicant during the term of the agreement. All property or facilities
developed with Facilities Grant funds must be dedicated for public use and
maintained for a period not less than twenty (20) years. In the event the
applicant fails to maintain the facility, or converts the use of the facility,
the applicant shall promptly reimburse the Board for all improvement costs
provided by the Board.
(n) All
projects must comply with "Uniform Sign Guidelines" as published by the Board.
All launch ramp facilities developed with Marine Board funds must have at least
one uniform boat ramp sign placed on roads leading to the facility in order to
direct the public.
(o) All projects
must be designed and engineered by a registered engineer or architect unless
completed using force account labor or otherwise provided by law. This will
assure the applicant and the Board that proper and necessary provisions are
being met with respect to public health, life and safety through the best use
of materials and labor at a minimal cost.
(p) A publication by the Board titled Design
Guidelines for Recreational Boating Facilities" provides basic technical
specifications and design criteria for the development of facility grant
projects. All projects must comply with these guidelines or other approved
methods.
(q) Applicants shall
forward one copy of the final plans and specifications to the Board for review,
prior to procuring any contractor, material supplier or commencing any work at
the project site. Marine Board staff will notify applicants of plan approval,
at which time they may commence implementation of the approved plan.
(r) The Board has the capability to provide
some design-engineering services for grant applicants. Requests for technical
engineering assistance should be directed to the Boating Facilities Section
Manager.
Notes
Publications: Publications referenced are available from the agency.
Statutory/Other Authority: ORS 830.110 & ORS 830.150
Statutes/Other Implemented: ORS 830.150
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.