Or. Admin. Code § 340-043-0120 - Guidelines for the Design, Construction, Operation and Closure of Chemical Mining Operations: Guidelines for Design, Construction, and Operation of Heap-Leach Facilities
(1) This
section applies to heap-leach facilities using dedicated, or expanding, pads.
Heap-leach facilities using on-off, reusable pads may require variations from
these rules; they shall be approved on a case-by-case basis by the
Department.
(2) The heap-leach
facility (pad and associated ponds, pipes and tanks) shall be sized to prevent
flooding of any of its components.
(3) Table 1 of this Division establishes
minimum capacity-sizing criteria for the leach-pad and ponds. The pad and ponds
may be designed to act separately or in conjunction with each other to obtain
the required storage volumes. Other design criteria may be used, with
Department approval, if local conditions warrant. The best available climatic
data shall be used to confirm the critical design storm event and estimate the
liquid levels in the system over a full seasonal cycle. The liquid mass balance
may include provision for evaporation.
(4) The heap leach pad liner system shall be
designed, constructed, and operated to meet the following criteria:
(a) A primary liner consisting, at a minimum,
of a continuous flexible-membrane of suitable synthetic material shall be
provided. This liner shall function together with the process chemical
collection system installed immediately above this liner (see section (8) of
this rule) to remove process chemicals from the heap;
(b) A leak detection system shall be
installed immediately below the primary liner for the purpose of detecting loss
of process solutions by leakage through the primary liner. The leak detection
system shall be capable of detecting leakage through the primary liner of 400
gallons/day-acre within ten weeks of leak initiation. The leak detection system
shall consist of appropriately sized collection piping placed within a minimum
thickness of 12 inches of permeable material (minimum permeability of 10-2
cm/sec) that is capable of withstanding the anticipated weight of the heap
without loss of function;
(c) A
secondary liner shall be placed below the leak detection system to provide
assurance that any leakage through the primary liner during the operation of
the heap and following closure of the heap is not released to the environment.
The secondary liner shall be of a composite design with a continuous
flexible-membrane of suitable synthetic material in direct contact with an
engineered, stable, low permeability soil/clay bottom liner (maximum
permeability of 10-7 cm/sec) with a minimum thickness of 36 inches;
(d) Each liner system component described in
subsections (4)(a)-(c) of this rule addresses a specific need and purpose with
respect to environmental protection. For purposes of evaluating alternative
facilities and methods of control under OAR
340-043-0050(2),
an alternative may be approved if the level of environmental protection
intended by each separate liner system component is achieved either within the
individual component or on a cross component basis.
(5) The processing chemical pond liner system
shall be designed, constructed, and operated to meet the following criteria:
(a) A primary liner consisting, at a minimum,
of a continuous flexible-membrane of suitable synthetic material shall be
provided. This liner shall provide for positive containment of processing
chemical solutions;
(b) A leak
detection system shall be installed immediately below the primary liner for the
purpose of detecting loss of process chemical solutions by leakage through the
primary liner. The leak detection system shall be capable of detecting leakage
through the primary liner of 400 gallons/day-acre within ten weeks of leak
initiation. The leak detection system shall consist of appropriately sized
collection piping placed within a layer of permeable material (minimum
permeability of 10-2 cm/sec);
(c) A
secondary liner shall be placed below the leak detection system to provide
assurance that any leakage through the primary liner during the use of the pond
is not released to the environment. The secondary liner shall be of a composite
design with a continuous flexible-membrane of suitable synthetic material in
direct contact with an engineered, stable, low permeability soil/clay bottom
liner (maximum permeability of 10-7 cm/sec) with a minimum thickness of 36
inches;
(d) Each liner system
component described in subsections (5)(a)-(c) of this rule addresses a specific
need and purpose with respect to environmental protection. For purposes of
evaluating alternative facilities and methods of control under OAR
340-043-0050(2),
an alternative may be approved if the level of environmental protection
intended by each separate liner system component is achieved either within the
individual component or on a cross component basis.
(6) Emergency ponds may be constructed as an
alternative to larger pregnant and barren ponds. The emergency pond may be
constructed to a lesser standard, with the limitation that it is to be used
only infrequently and for short periods of time. The Department will specify
reporting and use limitations for the ponds in the permit. A between-liner leak
detection system is not required for the emergency pond.
(7) The emergency pond liner shall be of
composite construction consisting of:
(a) An
engineered, stable, low permeability soil/clay bottom liner (maximum
permeability of 10-6 cm/sec) with a minimum thickness of 12 inches;
and
(b) A single flexible-membrane
synthetic top liner of suitable material.
(8) The heap-leach pad shall be provided with
a process chemical collection system above the upper-most liner that will
prevent an accumulation of process chemical within the heap greater than 24
inches in depth.
(9) The permittee
shall prepare a written operating plan for safe temporary shutdown of the
heap-leach facility and train employees in its implementation.
(10) The permittee shall respond to leakage
collected by the heap-leach and processing-chemical storage pond
leak-collection systems according to the process defined in Table 2.
(11) The permittee shall determine the
acid-generating potential of the spent ore by acid/base accounting and other
appropriate static and dynamic laboratory tests. If the spent ore is shown to
be potentially acid generating under the conditions expected in the heap at
closure, the permittee shall submit a plan for acid correction for Department
approval prior to loading the heap.
Notes
To view tables referenced in rule text, click here to view rule.
Statutory/Other Authority: ORS 468.020
Statutes/Other Implemented: ORS 468.020 & 468B.160