Or. Admin. Code § 340-045-0027 - Public Notice and Participation Requirements For Permitting Actions
(1) DEQ categorized
permitting actions according to environmental and public health significance.
Category I represents permit actions with low environmental and public health
significance and no public notice and opportunity for public participation.
Category IV represents permit actions with potentially high environmental and
public health significance, and the greatest level of public notice and
opportunity for public participation. The following describes the public notice
and participation requirements for each category:
(a) Category I -- No public notice or
opportunity for public participation.
(b) Category II -- DEQ will provide public
notice of the proposed action and a minimum of 30 days to submit written
comments.
(c) Category III -- DEQ
will provide public notice of the proposed action and a minimum of 35 days to
submit written comments. DEQ will provide a minimum of 30 days' notice for a
hearing if one is scheduled. DEQ will schedule a public hearing to allow
interested parties to submit oral or written comments if:
(A) For NPDES permits, DEQ receives written
requests for public hearing during the public comment period from at least ten
persons or from an organization or organizations representing at least ten
persons.
(B) For WPCF permits, DEQ
receives written requests for public hearing within 14 days of mailing the
public notice from at least ten persons or from an organization or
organizations representing at least ten persons; or
(C) DEQ determines that a hearing is
necessary.
(d) Category
IV: DEQ will:
(A) Once an application is
considered complete, provide public notice of receiving a completed application
and requested permitting action; and
(B) Schedule an informational meeting in the
community where the facility will be or is located and provide public notice of
the meeting. DEQ will consider any information gathered in this process in its
drafting of the proposed permit.
(C) Once a draft permit is complete, provide
public notice of the proposed permit and a minimum of 40 days to submit written
comments; and
(D) Schedule a public
hearing to allow interested parties to submit oral or written comments. A
minimum notice of 30 days shall be provided for the hearing.
(2) The following
actions are classified as follows:
(a)
Category I:
(A) Minor modification of an NPDES
or a WPCF permit;
(B) Issuing a
special, short-term WPCF permit;
(C) Issuing a new or renewing a WPCF permit
for an on-site sewage system with a design flow less than 20,000 gallons per
day, regulated by OAR 340-071.
(D)
NPDES or WPCF permit administrative actions that include but are not limited
to: transferring a permit to a new owner or operator, terminating or revoking a
permit, denying a permit, and withdrawing an application.
(E) Mutual agreement and order in lieu of a
WPCF permit.
(b) Category
II:
(A) Mutual agreement and order in lieu of
an NPDES permit unless delay in issuing the order may magnify the problem (see
OAR 340-045-0062(4));
(c) Category III:
(A) Issuing a new or renewing an NPDES
individual permit unless otherwise specified in this rule;
(B) Major modification of an NPDES permit
unless otherwise specified in this rule;
(C) Issuing a new or renewing a WPCF or NPDES
general permit;
(D) Issuing a
biosolids land application site authorization letter for any proposed site that
meets the sensitive site criteria in OAR
340-050-0030(2);
(E) Issuing a new WPCF individual permit
regulated by OAR 340-045, including a new WPCF permit for an on-site sewage
system with a design flow of 20,000 gallons per day or greater, regulated by
OAR 340-071.
(F) Approving a new
pretreatment program or a substantial modification to an existing approved
pretreatment program;
(G) All other
actions not elsewhere classified.
(d) Category IV:
(A) Issuing a new NPDES individual permit for
a major facility, as classified by DEQ.
(B) Issuing a renewal NPDES individual permit
for a major facility, as classified by DEQ, when there is a new or increased
discharged load.
(C) Major
modification of an NPDES individual permit for a major facility, as classified
by DEQ, when there is a new or increased discharged load.
(3) DEQ may move a permit action
to a higher category based on, but not limited to, the following factors:
(a) Anticipated public interest in the
facility;
(b) Compliance and
enforcement history of the facility or owner;
(c) Potential for significant environmental
or public harm due to location or type of facility, or
(d) Federal requirements.
(4) The public notice required
under section (1) (b), (c) and (d) (C) of this rule, will contain at least the
following information:
(a) Name and address of
the permittee and permit applicant and, if different, facility
location;
(b) Type of facility
including a description of the facility's process subject to the
permit;
(c) Description of the
proposed permitting action (i.e., new permit, renewal permit, or permit
modification);
(d) Description of
the permitted substances stored, disposed of, discharged, or emitted, including
whether there has been an increase or decrease in the substance since the last
permit action for the facility;
(e)
Location and description of documents relied on in preparing the draft permit
action;
(f) Other permits DEQ
requires;
(g) Date of the previous
permit action if a renewal or modification;
(h) Opportunity for public comment whether in
writing or in person if required;
(i) Compliance, enforcement and complaint
history, along with their respective resolutions; and
(j) A summary of discretionary decisions DEQ
made while developing the permit.
(5) DEQ will provide public notice as this
rule requires to the applicant, those requesting notice of the permitting
action, local news media, and other interested parties as DEQ
identifies.
(6) As best as is
practicable, DEQ will process under this rule, using the appropriate public
involvement category process under ORS 340-045-0027(1), all permit applications
DEQ receives before this rule's effective date.
Notes
Statutory/Other Authority: ORS 459.045, 459.785, 468.020, 468A.040 & 468B.048
Statutes/Other Implemented: ORS 459.245, 459.735, 459.740, 468.065, 468A.040 & 468B.048