Or. Admin. Code § 340-172-0050 - Site Assessment
(1) Unless
the Department finds the UST site meets the decommissioning requirements in OAR
Chapter 340, Division 150 or the cleanup standards described in OAR Chapter
340, Division 122 based upon currently available information, a person applying
for financial assistance must assess the site for contamination in accordance
with this section.
(2) One of the
following site assessments shall be conducted and submitted to the Department
for approval:
(a) A complete report of a site
assessment conducted after December 22, 1988;
(b) A site assessment following the sampling
method described in section (3) of this rule. The proposed sampling plan shall
be submitted to the Department for approval before initiating any
work;
(c) An alternate sampling
plan and site assessment procedure determined by the applicant and approved by
the Department before initiating any work.
(3) Unless otherwise approved by the
Department pursuant to subsection (2)(c) of this rule, collect soil or water
samples by boring or test pits:
(a) Where
groundwater is not present, collect one sample in each boring or test pit from
the native soils at an elevation below, but no more than two feet below, the
bottom of any underground storage tank and from any soil that appears to be
contaminated if encountered during installation of borings or test
pits;
(b) Where groundwater is
present, collect a soil and water sample at the soil/water interface in each
boring or test pit;
(c) Borings or
test pits shall be located along each side of an imaginary rectangular area
drawn around an UST or group of USTs so that each side of the rectangle lies a
maximum of three feet from the nearest UST:
(A) The imaginary rectangle may be drawn
around a group of USTs when each UST is within six feet of an adjacent
UST;
(B) A separate imaginary
rectangle must be drawn around each UST that is located more than six feet from
an adjacent UST;
(C) A minimum of
one boring or test pit shall be located at the midpoint on each side of the
imaginary rectangle. Where a side exceeds 15 feet, two or more borings or test
pits shall be located equally spaced along the side. Borings or test pits shall
not be located more than 25 feet apart along any side of the
rectangle.
(d) Analyze
the soil and/or groundwater samples in accordance with OAR
340-122-0205 through
340-122-0360.
(4) The sample collection and
analytical procedures shall meet the requirements of OAR Chapter 340, Division
122.
(5) The site assessment must
be performed under the direction or supervision of a licensed UST soil matrix
supervisor, registered professional engineer, registered geologist, or a
certified professional soil scientist (a soil scientist with certification and
inclusion in the American Registry of Certified Professionals in Agronomy,
Crops, and Soils, Ltd. (ARCPACS)).
NOTE:In addition to the site assessment described by this section, commercial lending institutions or insurers may require a person to complete Phase I and II environmental audits before issuing a loan.
Notes
Stat. Auth.:ORS 466.706 -ORS 466.895 &ORS 466.995
Stats. Implemented: OL 1991, Ch. 863
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.