New
Permits.
(a) Except for Short Term Activity
ACDPs, any person required to obtain a new ACDP must provide a complete
application with the following general information, as applicable, in addition
to any other information required for a specific permit type. Complete
applications must be submitted using electronic forms provided by DEQ, unless
otherwise approved in writing by DEQ:
(A)
Identifying information, including the name of the company, the mailing
address, the facility address, and the nature of business, Standard Industrial
Classification (SIC) code;
(B) The
name and phone number of a local person responsible for compliance with the
permit;
(C) The name of a person
authorized to receive requests for data and information;
(D) A description of the production processes
and related flow chart;
(E) A plot
plan showing the location and height of all emissions units, devices and
activities that emit to the atmosphere, including any air pollution control
devices, and the nearest residential and commercial properties;
(F) Make, model, and identification name or
number of each device, activity, and air pollution control device, if
known;
(G) Exhaust parameters
(e.g., stack height, diameter, temperature, flowrate, volume or area source
dimensions) of each emissions unit, device, and air pollution control device
that emits to the atmosphere;
(H)
The type and quantity of fuels used;
(I) An estimate of the amount and type of
each air contaminant emitted by the source in terms of hourly, daily, or
monthly and yearly rates, showing calculation procedures;
(J) Any information on pollution prevention
measures and cross-media impacts the applicant wants DEQ to consider in
determining applicable control requirements and evaluating compliance
methods;
(K) Estimated efficiency
of air pollution control devices under present or anticipated operating
conditions;
(L) Where the operation
or maintenance of air pollution control devices and emission reduction
processes can be adjusted or varied from the highest reasonable efficiency and
effectiveness, information necessary for DEQ to establish operational and
maintenance requirements in OAR
340-226-0120(1) and
(2);
(M) Land Use Compatibility Statement(s), when
required by OAR chapter 340, division 018:
(i) Signed by the applicable local planning
jurisdiction(s), determining that construction or modification of the source is
compatible with applicable local jurisdiction's acknowledged comprehensive
plan. If DEQ receives a LUCS which states that the proposed action is
incompatible with the acknowledged comprehensive plan, DEQ shall notify the
applicant that the application cannot be processed;
(ii) If the local planning jurisdiction
declines to provide a LUCS determination in response to a request for a LUCS,
the owner or operator must provide DEQ with its own analysis to demonstrate
that the proposed action complies with all applicable statewide planning
goals;
(N) The most
recent information reported through EPA's Toxics Release Inventory program at
the time of application submittal, if the source is subject to the
program;
(O) An air quality
analysis, conducted in accordance with the procedures in OAR chapter 340,
division 225, demonstrating that the emissions, including reductions due to air
pollution control devices or permitted limits on production capacity, will not
cause or contribute to a new exceedance of a National Ambient Air Quality
Standard adopted under OAR chapter 340, division 202;
(P) Any information required by OAR chapter
340, divisions 222, 224, 225, and 245, including but not limited to control
technology and analysis and air quality analysis, conducted in accordance with
the procedures in OAR chapter 340, division 225; and information related to
offsets and net air quality benefit, if applicable;
(Q) Anticipated date of the commencement of
construction (i.e., breaking ground); and
(R) Anticipated date of construction
completion; and
(S) Any other
information requested by DEQ.