Or. Admin. Code § 340-228-0609 - General Requirements
The owners and operators of a coal-fired electric utility steam generating unit must comply with the monitoring requirements as provided in this rule, 40 CFR part 63 subpart UUUUU, and OAR 340-228-0639 (if applicable).
(1) Requirements for
installation, certification, and data accounting. The owner or operator of each
coal-fired electric utility steam generating unit must:
(a) Install all applicable monitoring systems
required under this rule, 40 CFR part 63 subpart UUUUU, and OAR
340-228-0639 for monitoring Hg
mass emissions, inlet Hg (if applicable), and individual unit heat
input.
(b) Successfully complete
all certification tests required under 40 CFR part 63 subpart UUUUU and meet
all other requirements of this rule, 40 CFR part 63 subpart UUUUU, and OAR
340-228-0639 applicable to the
monitoring systems under subsection (1)(a) of this rule.
(c) Record, report, and quality-assure the
data from the monitoring systems under subsection (1)(a) of this
rule.
(2) Compliance
deadlines. The owner or operator must meet the monitoring system certification
and other requirements of section (1) of this rule on or before the following
dates. The owner or operator must record, report, and quality-assure the data
from the monitoring systems under subsection (1)(a) of this rule on and after
the following dates.
(a) Outlet Hg.
(A) For the owner or operator of a coal-fired
electric utility steam generating unit that commences commercial operation
before July 1, 2008, by January 1, 2009.
(B) For the owner or operator of a coal-fired
electric utility steam generating unit that commences commercial operation on
or after July 1, 2008, by the later of the following dates:
(i) January 1, 2009; or
(ii) 90 unit operating days or 180 calendar
days, whichever occurs first, after the date on which the unit commences
commercial operation.
(C)
For the owner or operator of a coal-fired electric utility steam generating
unit for which construction of a new stack or flue or installation of add-on Hg
emission controls, a flue gas desulfurization system, a selective catalytic
reduction system, or a compact hybrid particulate collector system is completed
after the applicable deadline under paragraph (2)(a)(A) or (B) of this rule, by
90 unit operating days or 180 calendar days, whichever occurs first, after the
date on which emissions first exit to the atmosphere through the new stack or
flue, add-on Hg emissions controls, flue gas desulfurization system, selective
catalytic reduction system, or compact hybrid particulate collector system.
(b) Heat input. For
monitoring systems used to monitor heat input in accordance with OAR
340-228-0606(4)(a),
if applicable, by the later of the following dates:
(A) July 1, 2012 or the date established
under OAR 340-228-0606(3);
or
(B) The date on which the unit
commences commercial operation.
(c) Inlet Hg. If required to perform coal
sampling and analysis in accordance with OAR
340-228-0606(4)(b)(A)(i)
or measure Hg emission prior to any control
device(s) in accordance with
340-228-0606(4)(b)(A)(ii),
if applicable, by the later of the following dates:
(A) July 1, 2012 or the date established
under OAR 340-228-0606(3);
or
(B) The date on which the unit
commences commercial operation.
(3) Reporting data.
(a) Except as provided in subsection (3)(b)
of this rule, the owner or operator of a coal-fired electric utility steam
generating unit that does not meet the applicable compliance date set forth in
section (2) of this rule for any monitoring system under subsection (1)(a) of
this rule must, for each monitoring system, determine, record, and report
maximum potential (or, as appropriate, minimum potential) values for Hg
concentration, stack gas flow rate, stack gas moisture content, and any other
parameters required to determine Hg mass emissions and heat input in accordance
with OAR 340-228-0637(5).
(b) The owner or operator of a coal-fired
electric utility steam generating unit that does not meet the applicable
compliance date set forth in paragraph (2)(a)(C) of this rule for any
monitoring system under subsection (1)(a) must, for each such monitoring
system, determine, record, and report substitute data using the applicable
missing data procedures in 40 CFR part 75 subpart D, in lieu of the maximum
potential (or, as appropriate, minimum potential) values, for a parameter if
the owner or operator demonstrates that there is continuity between the data
streams for that parameter before and after the construction or installation
under subsection (2)(a)(C) of this rule.
Notes
Stat. Auth.: ORS 468.020 & 468A.310
Stats. Implemented: ORS 468A.025