Or. Admin. Code § 340-232-0120 - Cutback and Emulsified Asphalt
(1) Use of any cutback asphalts for paving
roads and parking areas is prohibited during the months of April, May, June,
July, August, September, and October, except as provided for in section
(2).
(2) Slow curing (SC) and
medium curing (MC) cutback asphalts are allowed during all months for the
following uses and applications:
(a) Solely
as a penetrating prime coat for aggregate bases prior to paving;
(b) For the manufacture of medium-curing
patching mixes to provide long-period storage stockpiles used exclusively for
pavement maintenance; or
(c) For
all uses when the National Weather Service forecast of the high temperature
during the 24-hour period following application is below 10° C. (50°
F.).
(3) Rapid curing
(RC) grades of cutback asphalt are always prohibited.
(4)
(a) Use
of emulsified asphalts is unrestricted if solvent content is kept at or less
than the limits listed below. If these limits are exceeded, then the asphalt
shall be classified as medium curing (MC) cutback asphalts, and shall be
limited to only the uses permitted by section (2). (Grades of Emulsion Per
AASHTO Designation M 208-72 - Maximum Solvent Content by Weight.):
(A) CRS-1 - 3%;
(B) CRS-2 - 3%;
(C) CSS-1 - 3%;
(D) CSS-1h - 3%;
(E) CMS-2 - 8%;
(F) CMS-2h - 8%;
(G) CMS-2S -12%.
(b) Solvent content is determined by ASTM
distillation test D-244.
[NOTE: This rule is included in the State of Oregon Clean Air Act Implementation Plan that EQC adopted under OAR 340-200-0040.]
[NOTE: Referenced documents are available from the agency.]
Notes
Statutory/Other Authority: ORS 468.020, 468A.025 & 468A.070
Statutes/Other Implemented: ORS 468A.025 & 468A.070
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.