(1) The owner or operator of a GDF 4 as
described in OAR
340-244-0234(4)
must comply with all applicable requirements under OAR
340-244-0241;
(2) The owner or operator of a GDF 4 which
commenced construction on or after July 1, 2024 must comply with the following
for each gasoline storage tank with 250 gallon or greater capacity:
(a) Each storage tank must be dual-point;
and
(b) Install an Enhanced Vapor
Recovery system on each storage tank and ECO nozzles on each gasoline dispenser
under OAR
340-244-0246.
(3) The owner or operator of a GDF
4 which commenced construction before July 1, 2024 without a Stage II vapor
recovery system must comply with the following:
(a) Each new, replaced, or reconstructed
gasoline storage tank with 250 gallon or greater capacity must be dual-point
and install an Enhanced Vapor Recovery system under OAR
340-244-0246; and
(b) The owner or operator must install ECO
nozzles on all gasoline dispensers at the time any gasoline storage tank is
required to install an Enhanced Vapor Recovery system.
(4) The owner or operator of a GDF 4 which
commenced construction before July 1, 2024 and which has a complete Stage II
vapor recovery system must comply with OAR
340-244-0247.
[NOTE: This rule is included in the State of Oregon Clean Air
Act Implementation Plan that EQC adopted under OAR
340-200-0040 only for affected
sources in the Portland-Vancouver, Medford-Ashland, and Salem-Keizer Area
Transportation Study air quality management areas and all of Clackamas,
Multnomah, and Washington counties.]
Notes
Or. Admin. Code
§
340-244-0242
DEQ 15-2008, f. & cert.
ef 12-31-08; DEQ 8-2009, f. & cert. ef. 12-16-09; DEQ 1-2011, f. &
cert. ef. 2-24-11; DEQ 4-2013, f. & cert. ef. 3-27-13;
DEQ
7-2015, f. & cert. ef.
4/16/2015; DEQ 149-2018, minor correction filed
04/11/2018, effective 04/11/2018;
DEQ
13-2019, amend filed 05/16/2019, effective
5/16/2019;
DEQ
4-2024, amend filed 03/25/2024, effective
3/25/2024
Statutory/Other Authority: ORS
468.020 & ORS
468A.025
Statutes/Other Implemented: ORS
468A.025