Or. Admin. Code § 437-002-2323 - Helicopters
(1) Definitions:
(a) Designated employees. Those employees
selected or designated by the employer to work under or near helicopters who
have first been instructed in hooking, unhooking, guiding and securing the
load, including the signal person, all of whom have been instructed in the
hazards of helicopter work and who know the provisions of this section.
(b) Pilot in Command or Pilot
means the person who:
(A) Has the final
authority and responsibility for the operation and safety of the flight;
(B) Has been designated as pilot
in command before or during the flight; and
(C) Holds the appropriate category, class,
and type rating for the conduct of the flight if applicable.
(c) Helicopter Service Operator.
Entity that holds the appropriate Federal Aviation Administration (FAA)
operating certification and provides helicopter support services.
(d) Downwash. A down and outward air column
from the main rotor system.
(e)
Ground personnel or crew. Employees who work on or near the equipment and are
familiar with the hazards of helicopter use in power distribution and
transmission line work and who know these rules and the methods of operation.
(f) Helicopter, helicopter crane,
and rotorcraft. A heavier-than-air aircraft that depends principally for its
support in flight on the lift generated by one or more rotors. The use of the
word helicopter in these rules also means helicopter crane, rotorcraft, or
similar aircraft.
(g) Hooking and
unhooking. The process by which an external load is either attached to or
detached from the helicopter hook or sling line.
(h) Positive guide system. A system or method
of installing a load into position so that the load is capable of being
released from the helicopter without being otherwise secured, and the load will
remain in position permanently or until otherwise secured by physical means.
(i) Rotors. A system of blades
that rotates or revolves to supply lift or direction to the rotorcraft.
(j) Signal person. A member of the
ground crew that is designated by an employer to direct, signal and otherwise
communicate with the pilot of the helicopter.
(k) Sling. A strap, chain, rope or similar
implement used to securely hold something being lifted, lowered, carried or
otherwise suspended.
(l) Static
charge. An imbalance of electric potential within or on the surface of a
material.
(m) Tagline. A rope or
similar device used to guide or control the direction or movement of a load.
(2) Helicopter
regulations. Helicopter cranes must comply with any applicable regulations of
the Federal Aviation Administration (FAA).
(3) Hazard Analysis and Job Briefing.
(a) Before the commencement of any
construction, maintenance, or lifting activity using a helicopter, a Job Hazard
Analysis (JHA) must be conducted, which, at a minimum, must:
(A) Define the core tasks.
(B) Identify specific hazards.
(C) Identify mission specific tasks.
(D) Describe procedures or
controls used to safely manage or mitigate the hazards.
(E) Describe the communication procedure to
be used with the crew.
(F) Discuss
fatigue, and methods to eliminate or mitigate it.
(G) Specify Minimum Approach Distances (MAD).
(H) Describe a site specific
emergency action plan.
(b) A site specific job briefing must be held
each day construction, maintenance, or lifting activities using a helicopter
are performed. The daily job briefing at a minimum must:
(A) Summarize or recap the content of the JHA
as applicable to the day's duties.
(B) Communicate any site specific hazards not
identified in the JHA and provide mitigation for those hazards.
(C) Identify or establish roles for each
person who will be interfacing with the aircraft or its loads.
(D) Describe the communication procedure to
be used with the crew.
(E) Specify
Minimum Approach Distances (MAD) from energized electrical lines and equipment
in the work area.
(F) Describe the
applicable sections of the site specific emergency action plan, such as the
locations of first aid equipment and rescue gear.
(c) An additional job briefing must be held
immediately if working conditions change during the course of a job. Working
conditions would include weather, wind, and visibility. During the job briefing
all affected employees and others, including signal persons, ground workers,
pilots, must be advised of the hazards including a change of operation if
needed.
(4) Sling and
rigging.
(a) The pilot is responsible for the
integrity of the rigging for any external load and must ensure safe delivery of
the cargo by inspecting and monitoring the security of the rigging throughout
the operation. Prior to operations, the pilot must check the condition and
application of all rigging gear to ensure serviceability. Prior to commencing
operations, determine the complete rigging requirements including slings and
taglines.
(b) All personnel
involved with rigging activities must receive appropriate rigging training and
show proficiency, specific to helicopter operations and the work or task/s
being performed.
(c) The slings
used for the external load must be inspected each day before use. Slings must
be inspected by an employee designated, trained and qualified as a rigger.
(d) No sling can be used unless it
has a properly marked minimum tensile strength of five times the load which
will be carried or is being carried.
(A) No
sling can be used unless upon inspection it is determined to be in good
condition and capable of the work which is to be performed, and is properly
marked.
(B) Loads must be properly
slung so that there will be no slippage or shifting of the load and so that the
load will not accidentally be dislodged from the helicopter.
(C) Slings must be the appropriate weight,
strength and length to prevent the sling from being lifted and entangled into
the aircraft rotor system.
(D)
Pressed sleeves, wedged eyes, or equivalent means must be used for all
suspended loads using wire rope.
(5) Personal protective equipment when
working on, under or in the near vicinity of helicopters:
(a) Personal protective equipment for
employees must consist of complete eye protection and hard hats secured by
chinstraps.
(b) Loose-fitting
clothing likely to flap in the downwash must not be worn.
(6) Loose gear and objects. Every practical
precaution must be taken to provide for the protection of the employees from
flying objects in the rotor downwash. All loose gear within 100 feet of the
place of lifting the load, depositing the load, and all other areas susceptible
to rotor downwash must be secured or removed.
(7) Landing Zones.
(a) When establishing the landing zone, the
following items must be considered: size and type of helicopter, suitability of
the planned activity, physical barriers or obstructions, helicopter touchdown
area and congestion in the area.
(b) All helicopter landing, loading and
unloading areas must be maintained to reduce the likelihood of flying
materials, tripping, or other hazards attendant to the work being performed.
(8) Pilot's
responsibility.
(a) The helicopter pilot is
responsible for the size, weight and manner in which loads are connected to the
helicopter.
(b) No load can be
made if the helicopter pilot believes the lift cannot safely be performed. The
employer must make certain that the pilot of the helicopter is able to freely
exercise their prerogative and judgment as to safe operation of the helicopter
itself concerning size, weight and manner by which loads are connected.
(c) The pilot must possess the
appropriate ratings for the aircraft and must be competent to safely conduct
the assigned tasks. The pilot has the final authority and is solely responsible
for the safe operation of the helicopter loads at all times.
(9) Hooking and unhooking loads.
(a) Work performed at an elevated position
and directly under hovering helicopters may be performed only by qualified
employees.
(A) Work must be limited to the
minimum time necessary to guide, secure, hook or unhook the loads.
(B) When an employee is working from the
ground under hovering helicopters, the employee must have a safe means of
ingress and egress at all times, including readily available escape route or
routes in the event of an emergency.
(b) Positive guide systems must be used for
the placement of large segments of a primary tower structure and must enable
the heavy lift helicopter to temporarily secure and release the load.
(10) Static charge. All
loads must be grounded or bonded with a device capable of discharging either
the actual or potential static charge before ground personnel either touch or
come close enough to touch the suspended load.
(11) Line Stringing.
(a) Weight of the external load must not
exceed the manufacturer's load limit.
(b) Each helicopter operator engaged in line
stringing must be authorized by the Federal Aviation Administration (FAA) for
Part 133 Class C operations.
(c)
All line stringing operations must be conducted according to the following
requirements:
(A) Stringing tension method
must enable a consistent positive control of the cable, rope, or similar lines
at all times during pulling operations.
(B) During all pulling operations, the
helicopter pilot must maintain an aircraft orientation that allows the pilot to
maintain constant visibility in both directions on line.
(C) When pulling from the aircraft belly hook
attachment point, a ballast weight of a minimum of 300 pounds must be used. At
no time during the pulling operation can the load line that is attached to the
helicopter's belly hook attachment point exceed a 30 degree angle from
vertical. This does not apply when pulling from the helicopter's approved side
pull attachment point.
(12) Visibility. Employees must keep clear of
and outside the downwash of the helicopter except as necessary to perform a
permitted activity.
(13)
Communication.
(a) Communication must be
maintained between the air crew and ground personnel at all times by a
designated and qualified signal person. There must be a constant, open line of
communication, using radios or head and hand signals.
(b) Signal systems must be understood by the
air crew and the ground crew, including signal persons, prior to the hoisting
of any load.
(c) Signaling and
maintaining communications with the pilot are the sole and exclusive function
of the signal person during periods of loading and unloading. The signal person
must be distinguishable from other members of the ground crew by the pilot of
the aircraft. This may be by way of orange-colored gloves, vest, or other
apparel.
(d) The lead worker and
one top person must also have an operating transmitter and receiver.
(e) Authorized and qualified employees may
come within 50 feet of the helicopter when the rotor blades are turning, but no
closer, other than to enter the craft or to hook or unhook the load or do other
essential functions. Other employees may not come closer than 100 feet of the
aircraft when it is operating.
(f)
The signals between the signal person and the operator of the helicopter must
be those submitted to the Federal Aviation Administration for the particular
procedure or job. In the event no signals have been submitted to the Federal
Aviation Administration, a system of signaling must be used that has been
documented and that is capable of being clearly understood by all employees and
others involved in the job. When head signals are to be used, the qualified
worker must use a visually enhanced hard hat or helmet with clear markings to
indicate the desired movement. Any signals other than up/down or in/out will
require the use of hand signals.
(g) Should a change occur in the hazards,
method of performing the job, signals to be used, or other operating conditions
during the course of any particular job, a conference must immediately be held
at which time all affected employees and others, including signal persons,
ground personnel, and pilots, will be advised of such hazards or change of
operation. No employee is permitted to work unless such employee and others
fully understand the changes that have taken place.
(14) Helicopter Operation.
(a) Whenever approaching or leaving a
helicopter with blades rotating, all employees must remain in full view of the
pilot and remain in a crouched position while within 50 feet of the helicopter.
No employee can approach the rear of the helicopter unless directly authorized
and directed by the pilot of such craft. All employees when operating or
working within 50 feet of the helicopter with blades turning are subject to the
direction of the helicopter pilot.
(b) All materials and equipment loaded in the
aircraft must be properly secured for flight.
(c) Long objects, such as shovels and
live-line tools, must be carried horizontally and below the waist to avoid
contact with the aircraft rotor blades.
(d) The pilot must ensure that all loads are
safely secured to the helicopter, or in cargo baskets, and properly loaded with
regard to weight and balance.
(e)
Never throw anything while loading and unloading the helicopter. Thrown items
may come in contact with the aircraft rotor blade, causing damage to the
aircraft and possible injury to ground personnel.
(f) While in the helicopter, safety belts
must remain fastened at all times except when pilot instructs otherwise or
while entering or leaving the helicopter.
(g) Smoking in the helicopter is prohibited
at all times.
(15)
Helicopter Work Tasks.
(a) Human External
Cargo (HEC)
(A) The sling or vertical
suspension system for HEC is a vertical system suspended from the helicopter
cargo hook. The sling system must comply with FAA regulation 14 CFR Part 133
Class B or D - External Load.
(B)
Helicopter operations involving HEC must incorporate the use of a secondary
safety device, in addition to the helicopter's primary attachment means, to
prevent the inadvertent release of the load. This device must remain able to be
jettisoned in accordance with class B load requirements.
(i) HEC lines must be not less than 10:1
safety ratio between the rated breaking strength and the working load.
(ii) All harnesses used for
helicopter short-haul operations must meet the ANSI Z359.1-2007 standards for
class III (full body) harnesses and must be equipped with both dorsal and
sternal D rings.
(iii) All
suspension harnesses used for HEC must be adjusted to the user, and the harness
must be equipped with an orthostatic shock relief device. Such devices must be
used on flights lasting over five minutes.
(b) Hover Transfer.
(A) The qualified line worker must be
attached to the helicopter at all times when traveling between the ground and
the aerial transfer point or worksite. There must be an FAA approved attachment
point on the helicopter for the lineman's safety harness lanyard.
(B) If a platform system is used to transport
crews, or if a crewmember performs work from a platform system, the platform
system and all aircraft attachment points must comply with applicable FAA
regulations and requirements.
(C)
All platform operations must be conducted in accordance with the 14 CFR Part
133 Class A - External Load.
(D)
Flight and hovering capabilities of the helicopter must not be adversely
affected by the design of the platform.
(E) The platform may not adversely affect the
auto rotation and emergency capabilities of the helicopter.
(F) The platform and loads may affect the
lateral & longitudinal center of gravity weight and balance of the
helicopter in flight, therefore an engineered counter-balance system which will
ensure stability must be used if the platform exceeds the lateral center of
gravity limits of the manufactures specifications for the helicopter.
(16) Fires.
Open fires are not permitted in any area where fires will be affected by the
downwash of the rotors, nor can any employee smoke in an area subject to the
downdraft of the rotor.
(17)
Refueling operations.
(a) Refueling any
helicopter with either aviation gasoline or Jet B (Turbine) type fuel is
prohibited while the engines are running.
(b) Fueling of helicopters using Jet A
(Turbine-Kerosene) type fuel is allowed with engines running.
(c) All helicopter fueling must comply with
the following:
(A) No unauthorized people are
allowed within fifty feet of the refueling operation or fueling equipment.
(B) Fire extinguishers must be
available and must be in compliance with FAA regulations.
(C) All fueling personnel must be thoroughly
trained in the refueling operation and in the use of the available fire
extinguishing equipment they may be expected to use.
(D) There must be no smoking, open flames,
exposed flame heaters, flare pots, or open flame lights within fifty feet of
the refueling area or fueling equipment. The refueling area or the fuel truck
must be posted with "no smoking" signs.
(E) Prior to making any fueling connection to
the aircraft, the fueling equipment must be bonded to the aircraft by use of a
cable, thus providing a conductive path to equalize the potential between the
fueling equipment and the aircraft. The bond must be maintained until fueling
connections have been removed, thus allowing separated charges that could be
generated during the fueling operation to reunite. Grounding during aircraft
fueling is not permitted
(F) To
control spills, fuel must be pumped either by hand or power. Pouring or gravity
flow is not permitted. Self-closing nozzles or deadman controls must be used
and may not be blocked open. Nozzles may not be dragged along the ground.
(G) In case of a spill, the
fueling operation must be immediately stopped until such time as the person in
charge determines that it is safe to resume the refueling operation.
Notes
Stat. Auth.: ORS 654.025(2) & 656.726(4)
Stats. Implemented: ORS 654.001 - 654.295