Or. Admin. Code § 437-003-0752 - Site-Specific Erection Plan
In addition to and not in lieu of the provisions of 29 CFR 1926.752(e), the steel erection contractor must develop and implement a written site-specific erection plan.
Note: The site-specific erection plan does not have to be developed by an engineer, or resemble an engineering report.
NOTE: There is a presumption that some form of temporary guying or bracing is necessary to provide lateral stability to the structural steel framing as it is being erected. Accordingly, the employer has the burden of establishing that the structural steel framing is inherently stable during erection and/or the sequence of erection, plumbing, bolting and decking is such that structural stability is maintained at all times and no temporary guying or bracing is needed. Such determination must be documented in the site-specific erection plan.
Notes
Stat. Auth.: ORS 654.025(2) & ORS 656.726(4)
Stats. Implemented: ORS 654.001 - 654.295
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.