Or. Admin. Code § 629-623-0700 - Written Plans to Evaluate Public Safety Risk
(1) To allow evaluation of public safety risk
and the appropriate methods for reducing this risk, operators shall submit a
written plan for all timber harvesting or road construction operations with
intermediate or substantial downslope public safety risk as described in OAR
629-623-0300. Written plans
shall include:
(a) A determination of public
safety risk (OAR 629-623-0300);
(b) A map showing those portion(s) of the
operation containing high landslide hazard locations;
(c) The location of all existing and proposed
new roads crossing high landslide hazard locations;
(d) A detailed road design for all new or
reconstructed roads crossing high landslide hazard locations;
(e) The location of habitable structures
(Exposure Category A) and paved public roads (Exposure Category B) below the
operation and within further review areas;
(f) Locations where timber harvesting will
not occur;
(g) Locations where
partial cutting will occur and the specific silvicultural prescription;
and
(h) Additional information
related to the operation as requested by the State Forester.
(2) Operators shall submit a
written plan for proposed stream crossing fills constructed across debris
torrent-prone streams with substantial or intermediate downslope public safety
risk.
(3) Operators shall submit a
written plan for proposed waste fill areas within a drainage containing debris
torrent-prone streams where there is substantial or intermediate downslope
public safety risk.
Notes
Stat. Auth.: ORS 527.710(10)
Stats. Implemented: ORS 527.630(5), 527.674 & 527.714