Or. Admin. Code § 632-020-0159 - Monitoring Injection
(1)
The department requires monitoring of injection operations to ensure that there
is no escape of geothermal fluids from the casings or through the annular space
between casings and open hole except in the zone for which injection is
permitted.
(2) Monitoring required
by the department may include gauging pressure between casings, periodic
testing for casing leaks, surveys to detect movement of fluid in adjacent rock
formations, cement bond logs, temperature measurements, analyses of water
chemistry, special wellhead equipment or other methods employed by industry to
monitor re-injection operations.
Notes
Stat. Auth.: ORS 522
Stats. Implemented: ORS 522.305
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.