Or. Admin. Code § 690-018-0040 - Application Requirements
Applicants for allocation of conserved water shall provide to the Department the information described in this rule in substantially the same order as listed. The information shall include:
(1) The name of the applicant(s), mailing
address(es) and telephone number(s);
(2) The certificate, permit, or transfer
numbers or the name of the decree, if appropriate, of each water use subject to
transfer that will be modified by the proposed allocation of conserved
water;
(3) The date of priority and
source of water for each water right identified in section (2) of this
rule;
(4) The amount of water that
may be used under the original rights expressed as the maximum rate and annual
volume (duty) of water that may be diverted as stated on the water use subject
to transfer.
(5) A description of
the diversion facilities in sufficient detail for the Department to determine
the capacity of the system. The description shall include:
(a) For a project that has not been
completed, a description of the existing diversion facilities, including
diversion structures, pumps, conveyance facilities, an estimate of the amount
of water that can be diverted at the existing facilities stated as a rate of
diversion, and application methods that will be affected by the proposed
project; or
(b) For a project that
has already been completed, a description of the diversion facilities before
the conservation measure was implemented, including diversion structures,
pumps, conveyance facilities, the amount of water that was diverted at the
facilities stated as a rate of diversion before the conservation measure was
implemented, and application methods that will be affected by the
project.
(6) A
description of the proposed changes to be made in the physical system and
operations that will result in the conservation of water.
(7) The amount of water needed to meet the
beneficial use currently authorized after implementation of the conservation
measures described as a maximum rate and annual volume (duty) of
water;
(8) The amount of water
conserved by implementing the conservation measure calculated as the amount of
water identified in section (4) or section (5) whichever is less, minus the
amount of water identified in section (7), expressed as a maximum rate and
annual volume (duty) of water;
(9)
The proposed percentages and quantities of conserved water to be allocated to
the applicants and to the state and the proposed use of any conserved water
allocated to the applicant;
(10)
The applicant's choice of priority date for the conserved water, being either
the same as or one minute after that of the original right.
(11) For a project that has not been
completed, the date on which the applicant intends to:
(a) Begin construction of the conservation
project;
(b) Complete construction
and file notice of project completion pursuant to OAR 690-018-0062(1);
and
(c) Request that the allocation
be finalized pursuant to OAR 690-018-0062(3).
(12) For a project that has already been
completed:
(a) Evidence that the measure was
implemented within five years prior to the date of filing the application; and
(b) The date on which the applicant
intends to request that the allocation be finalized pursuant to OAR
690-018-0062(3).
(13) A
description of any expected effects of the proposed allocation of conserved
water on other appropriators that identifies what presently happens to the
water that the applicant is proposing to conserve;
(14) A description of any mitigation or other
measures planned to avoid harm to other water rights;
(15) A description of the intended use and
boundaries of the expected area within which the diversion structures and
places of use of the applicants' conserved water right would be
located;
(16) To the extent
possible, identification of the stream reach for which the conserved water
should be managed under an instream water right and any reservations or
dedications of the water to instream use;
(17) A map with sufficient detail to locate
and describe the facilities and areas affected by the conservation
measures;
(18) Identification of
any federal or state public sources of project funds and, if federal or state
public funds that are not subject to repayment will be used in the project,
information showing the estimated project costs and anticipated sources of
funds for the project including:
(a) The total
cost for project engineering and construction;
(b) The present value of any incremental
changes in the costs of operations and maintenance that are directly
attributable to the project that would not be incurred or realized in the
absence of the project;
(c) The
amount of funding and the value of any in-kind contributions for project
engineering and construction and for any incremental changes in the costs of
operations and maintenance to be provided from federal or state public funds
that are not subject to repayment; and
(d) The amount of funding and the value of
any in-kind contributions for project engineering and construction and for any
incremental change since costs of operations and maintenance to be provided
from other funds.
(19) If
construction of the project has begun or been completed and if more than 25
percent of the project costs have been expended before applying for allocation
of conserved water, evidence that the applicant has attempted to identify and
resolve the concerns of water right holders in the area, governmental entities,
or other organizations who have asked to be consulted regarding the allocation
of conserved water;
(20) A letter
showing irrigation district or water control district approval if the
conservation project is within the boundaries of the district;
(21) For applications submitted by irrigation
districts or water controls districts, evidence of an adopted policy consistent
with the requirements of OAR 690-018-0030.
(22) Land use information outlined in the
Department's Land Use Planning Procedures Guide; and
(23) Other information the Department or
Commission deems necessary and appropriate to aid in the evaluation of the
application.
(24) The appropriate
fee as required under ORS
536.050.
(25) The Director shall waive the application
fee based on the percent of conserved water allocated to the state for instream
use, not to exceed 50 percent of the application fee, if the instream
allocation is:
(a) To establish an instream
water right pursuant to ORS
537.348;
(b) Necessary to complete a project funded by
the Oregon Watershed Enhancement Board under ORS
541.375; or
(c) Determined and endorsed in writing by
Oregon Department of Fish and Wildlife as a change that will result in a net
benefit to fish and wildlife habitat.
Notes
Stat. Auth.: ORS 536.025, 536.027 & 537.480
Stats. Implemented: ORS 537.455-537.500
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.