Or. Admin. Code § 690-020-0043 - Design Requirements for New Dams or to Increase Dam Height: Penetrating Conduit(s) and Control of Flow through Conduits
New Dams on stream channels must have a low level Conduit. All other new Dams and Dams with increases to Dam Height must have a low level Conduit or other means to safely drain the reservoir. The Conduit and related control structures must be designed to meet the following criteria:
(1) Ability to lower the reservoir. The
minimum diameter of the Conduit should be determined through analysis of the
time required to drain the Dam at average annual inflow;
(a) The Conduits for High Hazard Dams shall
be capable of releasing the amount of Water which could be stored in the top
five feet of the reservoir in five days;
(b) The Conduits for Significant and Low
Hazard Dams must be able to release the amount of Water which could be stored
in the top five feet of the reservoir in ten days;
(c) All Conduits must be of sufficient size
to allow passage of inflows as needed;
(d) In no case shall Conduits be smaller than
eight inches in diameter;
(2) Durable and water-tight Conduits.
Conduits must be made of medium to heavy gage durable materials. Pipe joints
must be designed to seal and prevent leakage. Corrugated metal culverts are
only acceptable for Low Hazard Dams, and only when the Conduits are encased in
concrete. Encasement of Conduits in concrete may be used to assist in the
design of a durable Conduit and to reduce the potential for seepage and erosion
adjacent to the Conduit;
(a) Diaphragms using
materials designed as an effective Soil Filter are required for any Conduits
not designed as encased in concrete, and are required regardless of encasement
for all High Hazard Dams;
(b)
Seepage collars may not be used;
(3) Control Mechanisms. The design for the
control mechanism must be sturdy and durable. The control mechanism must allow
for air venting when needed, and allow manual operation to drain the reservoir
if hydraulic or other power controls are inoperable. Hydraulic or other power
controls must have redundancy if control relies on any submerged hydraulic or
pneumatic hoses or electrical conduits. Intake structures for outlet works must
have trash racks unless the Engineer of Record shows trash racks are
unnecessary, or not safe to construct due to conditions at the Dam site. For
High and Significant Hazard Dams, measures to prevent unauthorized use of the
control mechanism must be included in this design;
(4) Outlet structure. The outlet structure
must not be submerged when the inlet control Gate or Valve is fully closed. The
outlet structure must be designed to protect the Conduit from mechanical damage
and convey Water to the stream channel without channel erosion and cavitation
near the Gate structure; and
(5)
Pressurized operation. Conduits must be specified as suitable for pressurized
operation if they are to be operated with controls other than at the inlet of
the Conduit. Dams with Pressurized Conduits shall have a guard Gate installed
at the upstream end of the Conduit. Operations and maintenance plans are
required for any Dam designed for pressurized operation as per OAR
690-020-0068.
Notes
Statutory/Other Authority: ORS 536.027, 540.488
Statutes/Other Implemented: ORS 540.449, 540.488