Or. Admin. Code § 690-020-0600 - Civil Penalty Assessment for Dam Safety
(1) The Department may assess civil penalties
for the following violations:
(a)
Constructing a Dam without prior written approval from the Department of the
final Dam design, construction documents, and operation documents as described
in OAR 690-020-0080(1) and 0140(1);
(b) Impoundment of Water behind a Dam before
final documentation has been submitted and accepted by the Department as
provided in OAR 690-020-0080(4) and 0150(6);
(c) Removal of a High or Significant Hazard
Dam prior to providing a Removal plan, as required in OAR
690-020-0160;
(d) Failure to file
an Emergency Action Plan with the Department, the Office of Emergency
Management, and the local emergency services agency for the county where the
Dam is located, as provided in OAR 690-020-0400; and
(e) Failure to complete needed Maintenance
Actions on a High or Significant Hazard Dam, as identified in a prior
inspection document sent from the Department to the Dam owner, as described in
OAR 690-020-0310.
(2)
The civil penalty for Constructing a Dam prior to obtaining written approval
from the Department of final Dam design, construction, and operation documents
prior to Dam construction activity shall be $2,000 for a High Hazard Dam,
$1,000 for a Significant Hazard Dam, and $500 for a Low Hazard Dam.
(3) The civil penalty for impounding Water
prior to submission and acceptance by the Department of the final plans and
specifications shall be $1,000 per occurrence for a High Hazard Dam, $500 per
occurrence for a Significant Hazard Dam, and $250 per occurrence for a Low
Hazard Dam.
(a) Each day the Dam impounds
Water is considered a new occurrence and violation. A civil penalty may be
assessed for each day of violation for the period the reservoir is impounding
Water until satisfactory completion documents are submitted to and accepted by
the Department, until the reservoir is emptied, whichever is sooner.
(b) The Department may remit all or a portion
of a civil penalty if completion documents existed but were not submitted, and
those documents meet the criteria, or for Dams which are modified to be exempt
from Dam safety requirements as per ORS 540.446(1).
(4) The civil penalty for beginning
construction work to remove a Dam rated as High or Significant Hazard prior to
submission and acceptance of a Dam Removal plan, failure to modify the plan if
required, or failure to follow the modified plan shall be $2,000 for a High
Hazard Dam and $1,000 for a Significant Hazard Dam.
(a) Each day construction work is performed
to remove the Dam is considered a new occurrence and violation. A civil penalty
may be imposed for each day of violation beginning on the day Removal
activities began until the Dam is no longer storing Water and construction work
to remove the Dam has ceased.
(b)
The Department may remit all or a portion of this civil penalty if the
Department receives and accepts a Dam Removal plan and determines that Dam
Removal was consistent with the plan and completed safely with no downstream
damage.
(5) The civil
penalty for failure to file an Emergency Action Plan for a High Hazard Dam with
the Department, the Office of Emergency Management, and the local emergency
services agency for the county where the Dam is located shall be $2,000.
(a) Each month the Emergency Action Plan is
not filed is a new occurrence and violation. A civil penalty may be imposed for
each month of violation beginning on the date the notice of violation was first
provided to the responsible party.
(b) The Department may remit all or a portion
of the civil penalty if development of the plan is underway and the plan is
submitted within 60 days of the due date.
(6) The civil penalty for failure to complete
needed Maintenance Actions identified in a prior inspection document for Dams
rated as High or Significant Hazard shall be:
(a) A civil penalty of $500 may be assessed
for failure to perform required Maintenance Action(s) on a High Hazard Dam
which could result in the Dam becoming Unsafe. Each month will be considered a
new violation until the required Maintenance Action(s) is completed;
(b) A civil penalty of $250 may be assessed
for all other required Maintenance Action(s) for a High Hazard Dam. Each month
will be considered a new violation until the required Maintenance Action(s) is
completed;
(c) A civil penalty of
$250 may be assessed for failure to perform required Maintenance Action(s) on a
Significant Hazard Dam which could result in the Dam becoming Unsafe. Each
month will be considered a new violation until the required Maintenance
Action(s) is completed;
(d) A civil
penalty of $150 may be assessed for failure to complete all other required
Maintenance Action(s) for a Significant Hazard Dam. Each month will be
considered a new violation until the required Maintenance Action(s) is
completed; and
(7) The
Department may remit all or a portion of a civil penalty, considering the Dam
owner's efforts to comply.
Notes
Statutory/Other Authority: ORS 536.027, 540.488
Statutes/Other Implemented: ORS 540.449, 540.452, 540.467, 540.482, 540.488, 540.995