Or. Admin. Code § 690-519-0010 - Power Operations
(1) It is
of the highest priority and in the public interest that mainstem federal
project operators shall provide instream flows in the Columbia River sufficient
to support fish life, navigation and recreational uses, and that federal
project operators shall incorporate such flow levels as a firm requirement in
all power system planning and operation agreements and procedures.
(2) Hydropower peaking operations which do
not cause excessive reservoir fluctuations to interfere with beneficial uses of
water are declared to be in the public interest. To minimize adverse impacts on
other beneficial water uses, federal project operators shall not exceed project
limits on reservoir rates of change.