Or. Admin. Code § 695-035-0050 - [Effective 7/1/2025] Eligible Small Grant Projects
(1) The Small Grant Program will fund only those projects
that:
(a) Demonstrate in the Small Grant Project application a clear
watershed benefit to aquatic species, wildlife, or watershed health.
(b) Are consistent with the local Small Grant Team's priority
watershed concerns, as identified in their program grant agreements with
OWEB.
(c) Adhere to OWEB administrative rules, OAR
695-005-0010-695-005-0060 and 695-050-0010-695-050-0050.
(d) Implement a project to restore, enhance, or protect native
fish or wildlife habitat, watershed or ecosystem functions, or water
quality.
(e) Are implemented in a manner that follows professionally
accepted restoration approaches resulting in ecological or watershed
benefits.
(f) Use and clearly identify in the small grant application
technical guidance from at least one of the approved sources in OAR
695-035-0030(3), and cite in the application the practice code(s), or the page
number and paragraph, for the technical guidance source listed.
(g) Where applicable, have been approved for technical
sufficiency by the appropriate state agency, or by the appropriate tribal
government for projects on Tribal Trust Lands.
(2) Small Grant Projects to be completed in phases on the same
property are eligible for Small Grant Project funding, provided only one phase
is submitted for funding consideration per OWEB fiscal year, and provided all
phases occur at different locations on the property. In general, OWEB
encourages multi-phased project applications to be submitted through other OWEB
grant programs.
(3) Teams must select from the following list when identifying
priority watershed concerns for their Small Grant Area:
(a) Instream Process and Function;
(b) Fish Passage;
(c) Urban Impact Reduction;
(d) Riparian Process and Function;
(e) Wetland Process and Function;
(f) Upland Process and Function;
(g) Water Quantity and Quality/Irrigation Efficiency;
(h) Road Impact Reduction.
(4) The following project types are eligible for funding. Teams
are encouraged to be strategic in identifying eligible project types in an
effort to better support salmon recovery objectives and Agricultural Water
Quality Management Area Plans. Teams may petition OWEB to allow project types
not appearing on the list, as described in OAR 695-035-0020(9)(c).
(a) Instream Process and Function.
(A) Improve Instream Habitat: place large wood, boulders, or
salmon carcasses;
(B) Manage Erosion: bioengineer stream banks, slope stream
banks, or develop water gaps, streambank barbs;
(C) Eradicate or Control Exotic Aquatic Species.
(b) Fish Passage.
(A) Remove Irrigation or Push-Up Dams: install alternatives
(e.g., infiltration galleries, point-of-diversion transfers) or convert from
gravity diversion to pumps;
(B) Remove and/or Replace Culverts (as a condition of funding,
such projects require ODFW or ODF technical review and approval, or tribal
government review and approval for projects on Tribal Trust Lands, using a
standard OWEB form; and for culverts under state roads, a 50 percent ODOT
match);
(C) Remove or Replace Stream Crossings (as a condition of
funding, such projects require ODFW or ODF technical review and approval, or
tribal government review and approval for projects on Tribal Trust Lands, using
a standard OWEB form).
(c) Urban Impact Reduction.
(A) Install Stormwater Runoff Treatments (e.g., create
bioswales, pervious surfaces, native plant buffers, green roofs);
(B) Create Off-Channel Flood Storage;
(C) Employ Integrated Pest Management.
(d) Riparian Process and Function.
(A) Manage Nutrient and Sediment Inputs through managed grazing
(e.g., fencing and developing off-channel watering) and plantings;
(B) Manage Vegetation: plant or seed native riparian species,
propagate native riparian plants, or control weeds in conjunction with a
restoration project;
(C) Employ Integrated Pest Management.
(e) Wetland Process and Function.
(A) Manage Nutrient and Sediment Inputs: fence out livestock or
develop alternative watering sites;
(B) Manage Vegetation: control weeds (in conjunction with a
restoration project), or plant native wetland species;
(C) Restore Wetlands: excavate or remove fill, or eliminate
drainage structures;
(D) Employ Integrated Pest Management.
(f) Upland Process and Function.
(A) Manage Erosion on Agricultural Lands: terrace land; employ
laser leveling; create windbreaks; install water and sediment control basins
(WASCBs); develop filter strips/grassed waterways; manage mud (e.g., gravel
high-use areas, develop paddocks); seed bare areas (OWEB may require a grazing
management plan, if appropriate, prior to release of funds. For post-fire
areas, seed only where natural regeneration is unlikely - e.g., on slopes of 30
percent or more - or where it can be demonstrated that seeding would retard or
prevent the spread of noxious weeds); or reduce tillage.
(B) Manage Nutrient and Sediment Inputs to Streams through the
management of grazing, vegetation cover, animal waste, or irrigation
runoff.
(C) Manage Vegetation: prescribed burning, except when
conducted as part of a commercial harvest; non-commercial thinning;
control/remove juniper (except late-seral/old growth); plant or seed (native
upland species or native beneficial mixes preferred); or control weeds (in
conjunction with a restoration project). Projects for prescribed burning to
reduce fuel loads require ODF technical review and approval, or tribal
government review and approval for projects on Tribal Trust Lands, using a
standard OWEB form.
(D) Manage Wildlife: install water guzzlers.
(E) Employ Integrated Pest Management.
(g) Water Quantity and Quality/Irrigation Efficiency.
(A) Recharge Groundwater: roof water harvesting;
(B) Implement Irrigation Practices (e.g., pipe existing ditch,
install drip or sprinkler systems, install automated soil moisture sensors
where water and electrical savings can be documented, or recover or eliminate
tail water). Such projects must either not adversely impact the current level
of groundwater in a Groundwater Management Area, or must measurably reduce the
diversion of water at the point of diversion. As a condition of funding,
irrigation efficiency projects require local watermaster technical review and
approval, or tribal government review and approval for projects on Tribal Trust
Lands, using a standard OWEB form.
(h) Private Road Impact Reduction.
(A) Decommission Roads;
(B) Improve Surface Drainage: surface road drainage
improvements, gravel surfacing, stream crossings.
Notes
Statutory/Other Authority: ORS 541.906