Or. Admin. Code § 734-055-0050 - Maintenance and Operation
(1)
Applicant shall at all times keep facilities authorized by the permit in a good
state of repair both structurally and, in the case of signs, a clean and neat
appearance.
(2) In the event
applicant plans to raise the operating pressure for existing pressure pipe
lines covered by permit above the "maximum operating pressure" shown in said
permit, application for a new permit or an amendment to the existing permit is
required.
(3) In the event
applicant plans to install additional conductors, or replacement conductors of
a higher capacity, on an existing aerial pole line covered by permit,
application for a new permit or an amendment to the existing permit is
required.
(4) Prior to performing
any maintenance work on the facility, applicant shall obtain prior approval
from the DM.
(5) All abandoned
facilities belonging to the applicant shall be removed from the right-of-way by
the applicant, unless the DM allows the facilities to remain by
permit.
Notes
Stat. Auth.: ORS 184 & ORS 374
Stats. Implemented: ORS 374.305
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.