Or. Admin. Code § 734-055-0100 - Permit Allowing Open Cut of Road Surface
(1) Unless special permission is first
obtained from the DM to install by open cut, a pipe line or conduit which
crosses under the roadway of the highway, including road or street connections,
or road approaches or driveways shall either be tunneled, jacked or driven, or
placed in a hole bored under the surface for that purpose in accordance with
the following provisions:
(a) Trenching in
connection with any of these methods shall be no nearer the toe of the fill
slope in fill sections or the point where the outer edges of the surfacing
meets the subgrade in other sections than specified in the Special
Provisions;
(b) If the tunneling
method is used it shall be by an approved method which supports the surrounding
materials so as to prevent caving or settlement. Areas around the installed
pipe or conduit shall be backfilled with moist sand, granular material or
cement grout filling all voids and packed in place with mechanical tampers or
other approved devices. Lagging, bulkheading and timbering shall be removed as
the backfilling progresses;
(c)
When the jacking, driving, or boring method is used it shall be by approved
means which will hold disturbances of surrounding material to a minimum.
Sluicing and jetting is not permitted. Voids or displacement around the outside
perimeter of the pipe, conduit or cable shall be filled with sand or cement
grout packed in place.
(2) When special permission is granted to
open cut the surfaced portion of the highway the following provisions shall be
adhered to:
(a) The trench edges in paved
areas shall be sawed or cut to neat lines by methods satisfactory to the DM to
a depth sufficient to permit removal of pavement without damage to pavement to
be left in place. Pavement within the cutting limits together with all other
excavated material shall be removed and disposed of outside the highway
right-of-way;
(b) In trenching
across the highway, no more than 1/2 of the traveled way is to be opened at one
time. The opened half shall be completely backfilled before opening the other
half;
(c) Closure of intersecting
streets, road approaches or other access points will not be permitted. Upon
trenching across such facilities, steel running plates, planks or other
satisfactory methods shall be used to provide for traffic to enter or leave the
highway of adjacent property.
(d)
Unless approved by the DM, no more than 300 feet of trench longitudinally along
the highway shall be open at one time and no trench shall be left in an open
condition overnight;
(e)
Immediately after the facility authorized by the permit has been placed in the
trench, the trench shall be backfilled to the standard specified by the DM,
producing a density in place of not less than 95 percent of relative maximum
density. Granular backfill material shall be placed to an elevation which will
allow placing the following foundation material and wearing surface:
(A) Where original surface was asphalt
concrete or bituminous treatment of mix:
(i)
Wearing surface - Asphalt concrete placed to a compacted thickness of 4" or the
thickness of the removed pavement, whichever is greater;
(ii) Foundation material - Either l" - O" or
3/4" - 0" aggregate placed to a compacted thickness of 12" or the thickness of
the removed stone base, whichever is greater.
(B) Where original surface was Portland
cement concrete:
(i) Wearing surface -
Portland cement concrete placed to a thickness of 6" or the thickness of the
removed pavement, whichever is greater;
(ii) Foundation material - same as for
asphalt concrete.
(C)
Where original surface was crushed rock or gravel: Wearing surface and
foundation material - Either l" - O" or 3/4" - O" aggregate placed to a total
compacted thickness of 4" or the thickness of the removed stone base and
wearing surface, whichever is greater;
(D) Placement of all materials in subsections
(a) through (e) of this section shall conform to the requirements of the
current Oregon Department of Transportation Standard Specifications for Highway
Construction.
(f) For a
period of two years following the patching paved surface, applicant shall be
responsible for the condition of said pavement patches, and during that time
shall, upon request from the DM, repair to the DM's satisfaction any of the
said patches which become settled, cracked, broken or otherwise
faulty.
Notes
Stat. Auth.: ORS 184 & ORS 374
Stats. Implemented: ORS 374.305
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.