Or. Admin. Code § 734-082-0050 - Load Length

(1) Variance permits are required for non-divisible loads that exceed legal length specified in ORS Chapter 818.
(2) Overlength permits will not be valid if overlength is caused by multiple items placed end to end, or overlapping unless specifically stated on the permit as authorized by statute or rule.
(3) Items joined (by spot weld, tack weld, bolting, strapping, etc.) to facilitate transport, shall be considered to be divisible loads and not eligible for overlength permits.

Notes

Or. Admin. Code § 734-082-0050
TO 3-2000, f. & cert. ef. 2-11-00; DOD 1-2025, amend filed 03/13/2025, effective 3/13/2025

Statutory/Other Authority: ORS 184.619 & 818.200

Statutes/Other Implemented: ORS 818.210, 818.220 & 818.225

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.