Or. Admin. Code § 918-100-0100 - Requirements for Applicants
An applicant electing to have a covered facility inspected under a master permit shall:
(1) Take
out an annual master permit with the inspecting jurisdiction, designate the
covered facility involved, define whether the work will be done by exempt
employees, licensed plumbing employees or registered contractors or any
combination, and pay the required fees;
(2) Create and keep records of all master
permit installations showing what was done, the employee or contractor doing
the work, when it was done and material used;
(3) File reports covering work done every
three months and make the original records available for the jurisdictional
inspector;
(4) Arrange an
inspection schedule with the inspecting jurisdiction. Every covered facility
shall be inspected at least once a year, or more frequently if deemed necessary
by the inspecting jurisdiction based upon the size, use or occupancy of the
building;
(5) Not cover until
inspected, tested and approved;
(6)
Make corrections required upon inspection regardless of who did the
work;
(7) Pay, upon request from
the inspecting jurisdiction, the fee for the inspection hours used to service
the facility or facilities;
(8)
Take out a timely separate permit, pay fees and have individual inspections for
installations outside the scope of a master permit.
Notes
Stat. Auth.: ORS 455.040(1), ORS 455.144(7) & ORS 479.560, Ch. 368, OL 2003
Stats. Implemented: Ch. 368, OL 2003
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.