Or. Admin. Code § 918-225-0620 - Bulk Rate Permits
(1) Bulk rate
permits may be granted if there is a quantity of either six (6) or more boilers
or six (6) or more pressure vessels at the same location.
(2) To obtain bulk rate permits, the owner or
user must make a written request to the division at least 30 days before the
expiration of existing operating permits.
(3) If a bulk rate site requires two or more
inspections during an inspection cycle, the division may rescind bulk rate
permits and charge the full operating permit fees, as provided in Table 3-B.
Inspection cycles are listed in OAR
918-225-0570 Table 1-B.
[NOTE: Table referenced is not included in rule text.]
Notes
To view tables referenced in rule text, click here to view rule.
Statutory/Other Authority: ORS 480.600
Statutes/Other Implemented: ORS 480.600
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.