Or. Admin. Code § 918-450-0005 - Seasonal Farm-Worker Housing
(1)
Purpose and Scope of This Rule:
(a) Is
authorized by ORS 455.380;
(b) Creates a uniform application and method
for computing construction permit fees; and adopts seasonal farm worker housing
standards; and
(c) Applies even
though the applicant for a permit does not otherwise meet the requirements of
ORS Chapter 455 and rules under that chapter.
(2) Issuance of Permits: Regardless of the
provisions of ORS 455.150:
(a) The application for construction permits
throughout the state for the rehabilitation of existing seasonal farm-worker
housing, shall be filed on a uniform application form provided by the division
or on a reasonable facsimile of the form;
(b) The fee for the structural portion of the
building permit for rehabilitation of seasonal farm-worker housing shall be
computed by taking the value of work that will be added to the existing
structure, dividing it in one-half, rounding the resulting amount to the
nearest dollar and applying that amount to the valuation table for determining
the structural portion of the permit fee. All other methods of computing permit
fees shall be uniform throughout the state and shall follow the methods
established by the division for the applicable specialty code.
(3) Seasonal Farm Worker Housing
Standards:
(a) Adoption: The minimum health
and safety standard for the rehabilitation of existing seasonal farm worker
housing outside of city limits is the Oregon Occupational Safety and
Health Code, OAR
437-004-1120 (Agricultural Labor
Housing and Related Facilities) effective October 1, 1998, which is adopted by
reference;
(b) Interpretation: The
subsections of the Occupational Safety and Health Code, OAR
437-004-1120 listed below, are
only applicable to the enforcement of health and safety construction standards
as follows:
(A) OAR
437-004-1120(9)(b)
does not waive the requirements of the Oregon Plumbing Specialty
Code;
(B) OAR
437-004-1120(11)(a)(D)
does not waive the requirements of the Oregon Mechanical Specialty
Code;
(C) The reference to
the Uniform Building Code in OAR
437-004-1120(12)(e) and
(f) is changed to Oregon Structural
Specialty Code, Chapter 1, Section 1003.
(c) Any new construction must be built in
compliance with the State Building Codes, unless otherwise
exempted; and
(d) The following
subsections of the Occupational Safety and Health Code, OAR
437-004-1120, are not adopted
for enforcement of health and safety construction standards for the
rehabilitation of existing seasonal farm worker housing:
(A) OAR
437-004-1120(5);
(D) OAR
437-004-1120(8)(e);
the last sentence of (f); (g), (h), (k); the first sentence of (l); (m), (q),
(t) and (w);
(G) OAR
437-004-1120(12)(a),
the second sentence;
(H) OAR
437-004-1120(13);
(I) OAR
437-004-1120(14);
(J) OAR
437-004-1120(15);
and
(K) OAR
437-004-1120(16).
Notes
Publications: The publication(s) referred to or incorporated by reference in this rule are available from the agency.
Stat. Auth.: ORS 455.380
Stats. Implemented: ORS 455.380
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.