25 Pa. Code § 105.112 - Stream flow during construction, filling and repair
During the period of construction, modification, enlargement or repair and during the period that the reservoir is being filled, the permittee shall allow a sufficient flow of water, as determined by the Department, into the stream below the dam to support fish and other aquatic life and to preserve the water quality in the stream.
Notes
The provisions of this § 105.112 amended under section 5 of the Dam Safety and Encroachments Act (32 P. S. § 693.5).
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.