25 Pa. Code § 11.5 - Statement of dredging policy
(a) The
Department, under its role as proprietor of the mineral resources in the beds
of the navigable streams of this Commonwealth, has reviewed its agreement
program for commercial dredging and has concluded that further restrictions
must be placed on the removal of sand and gravel from the beds of these streams
in order to protect the public interest. The Department will accept
applications for annual agreements in Lake Erie, the Ohio River and the
Allegheny River below East Brady. In the case of the Allegheny River above East
Brady, the Department will accept applications for annual agreements only
through 1980. The agreements shall be limited to existing dredge pools between
river miles 126.4 and 131.9 between Franklin and Oil City, Venango County, and
between river miles 184.7 and 185.5, at Conewango Township, Warren County. This
5-year phase-out of dredging in the Upper Allegheny is based on the following
reasons:
(1)
Natural and scenic
resources. The Upper Allegheny River is a unique natural and scenic
resource. It has been named as a potential addition to the National Wild and
Scenic Rivers System, under proposed Federal legislation, and has been
designated for in-depth study as a highest priority river under the
Pennsylvania Wild and Scenic Rivers program. Dredging, however, diminishes the
qualities which both of these programs protect.
(2)
Fishery resource. The
extraction of sand and gravel from the Upper Allegheny seriously impairs its
value as a fishery resource. By destroying riffle areas, the shallow areas of
the river most favorable to fish propagation, dredging interferes with the
aquatic habitat necessary to support fish life. The deep dredged pools fill
with sediment, resulting in an alteration of the fish life inhabiting the
pools. Rough fish, such as carp and other bottom feeders, replace game fish.
The entire aquatic ecosystem is altered in dredged areas.
(3)
Hydraulic effects.
Dredging has adverse hydraulic effects on the river. By lowering the normal
water surface and increasing the cross-sectional area of the river, it prevents
the water from assuming its natural slope and creates a falls effect at the
upper end of the dredge pool. The lowering of the river bottom by dredging
steepens the stream grade at the head of the dredged pool and causes increased
flow velocities at this location. The velocities cause additional erosion,
resulting in the lowering of the bottom grades of the river and its
tributaries. This subsequent erosion condition may persist for years, resulting
in possible damage to streamside improvements and degradation of water quality
through siltation. Dredging slows water velocity in the rest of the pool; in
the winter this effect increases the possibility of ice jams, as the slower
moving waters cannot remove the ice.
(4)
Recreational resource.
The Upper Allegheny is also utilized as a recreational resource by canoeists,
boaters, and those with summer homes along its shore. These recreational uses
contribute substantially to the local economy. Dredging, however, adversely
affects uses of the shoreline and may lower property values, both of which
would have an impact on the economic benefit of recreational uses. Although it
may provide deep pools for boating, dredging creates dangers for canoeists who
find themselves pulled over the upper edge of dredged pools and waders who
suddenly experience a sharp fall upon stepping over the edge of the pool. The
dredge apparatus and barges also interfere with boat traffic on the
river.
(b) No other stream
in Northwestern Pennsylvania has the recreational and fishery value of the
Upper Allegheny River. Although the sand and gravel deposits in the river bed
are resources which provide economic opportunities, land deposits of those
minerals exist in the area. The removal of extraction operations from the river
to land-based deposits will allow both the preservation of the Upper Allegheny
as a recreational and fishery resource and the continued production of sand and
gravel. The Department believes that 5 years is a completely adequate period to
accomplish this conversion.
(c)
After a careful consideration of the factors noted in this section, the
Department is of the opinion that the preservation of the Upper Allegheny as a
natural, scenic, and recreational resource for the present and future citizens
of this Commonwealth outweighs any benefits the dredging activity may
provide.