(a)
Applicability. Beginning March 26, 2022, this section applies
to the owner and operator of a gasoline storage tank subject to §
129.61 (relating to small gasoline
storage tank control (Stage I control)) if the gasoline storage tank is located
in Allegheny, Armstrong, Beaver, Bucks, Butler, Chester, Delaware, Fayette,
Montgomery, Philadelphia, Washington or Westmoreland County and, if one of the
following is met:
(1) Except as specified in
paragraph (2), the gasoline dispensing facility has had a monthly throughput
greater than 10,000 gallons (37,850 liters) of gasoline assessed on December 31
annually, beginning with the 2021 calendar year.
(2) The owner or operator of the gasoline
dispensing facility is an independent small business marketer of gasoline as
defined under section 324(c) of the Clean Air Act (42 U.S.C.A. §
7625(c)) and the gasoline
dispensing facility has had a monthly throughput equal to or greater than
50,000 gallons (189,250 liters), assessed on December 31 annually beginning
with the 2021 calendar year.
(3)
The monthly throughput of the gasoline dispensing facility exceeds the
applicable monthly throughput threshold of paragraph (1) or paragraph (2) at
any time after March 26, 2022, but later falls below the applicable monthly
throughput threshold of paragraph (1) or paragraph (2). The owner and operator
of the gasoline dispensing facility remain subject to the applicable
requirements of this section for the gasoline dispensing facility, even after
the monthly throughput falls below the applicable monthly throughput threshold
of paragraph (1) or paragraph (2).
(b)
CARB vapor recovery test
procedures. The following are the CARB vapor recovery test procedures
specified in this section:
(1) CARB
TP-201.1E-"Leak Rate and Cracking Pressure of Pressure/Vacuum Vent Valves,"
adopted October 8, 2003, including updates and revisions.
(2) CARB TP-201.3-"Determination of 2 Inch WC
Static Pressure Performance of Vapor Recovery Systems of Dispensing
Facilities," adopted April 12, 1996, and amended March 17, 1999, and July 26,
2012, including updates and revisions.
(3) CARB TP-201.3C-"Determination of Vapor
Piping Connections to Underground Gasoline Storage Tanks (Tie-Tank Test),"
adopted March 17, 1999, including updates and revisions.
(4) CARB TP-201.1B-"Static Torque of
Rotatable Phase I Adaptors," adopted July 3, 2002, and amended October 8, 2003,
including updates and revisions.
(c)
Vapor leak rate monitoring
procedures. The owner or operator of a gasoline dispensing facility
subject to this section shall monitor the gasoline dispensing facility Stage I
vapor recovery system piping for vapor leaks in one of the following ways:
(1) Perform specified test procedures under
subsection (d).
(2) Perform
continuous monitoring under subsections (e), (h), (i) and (j).
(d)
Vapor leak rate
monitoring using specified test procedures. The owner or operator of a
gasoline dispensing facility monitoring the gasoline dispensing facility Stage
I vapor recovery system piping for vapor leaks under subsection (c)(1) shall do
all of the following:
(1) Conduct each of the
CARB TP-201.1E, CARB TP-201.3 and CARB TP-201.3C test procedures at least once
in every 12-month period. Also, if the Stage I vapor recovery system is
equipped with a rotatable adaptor, conduct a CARB TP-201.1B test procedure once
in every 12-month period.
(i) These four test
procedures may be conducted simultaneously, consecutively or separately at
different times during the 12-month period.
(ii) Repair to a component on, or correction
to, the Stage I vapor recovery system may not be made on the day of the CARB
TP-201.3 or CARB TP-201.3C test procedure prior to completion of the test
procedure.
(iii) Repair to a
component on, or correction to, the Stage I vapor recovery system must be made
within 10 days following a failed CARB TP-201.1E, CARB TP-201.3, CARB TP-201.1B
or CARB TP-201.3C test procedure.
(iv) If a repair to a component on, or
correction to, the Stage I vapor recovery system is made to pass the CARB
TP-201.3 test procedure, then the CARB TP-201.3 test procedure must be
conducted once in every 6-month period. The first test procedure conducted
under this subparagraph must be conducted in the month that the repair to a
component on, or correction to, the Stage I system is made under subparagraph
(iii). The once-in-every-12-month period CARB TP-201.3 test procedure may
resume when two consecutive once-in-every-6-month period CARB TP-201.3 test
procedures do not reveal a failure requiring repair or correction.
(v) Perform CARB TP-201.1E, CARB TP-201.3,
CARB TP-201.3C AND CARB TP-201.1B on or before March 26, 2023, and on an annual
basis thereafter.
(2)
Record all of the following information, as applicable, for each test procedure
performed under paragraph (1):
(i) The name of
the test procedure.
(ii) The name
of the person performing the test procedure.
(iii) The date the test procedure was
performed.
(iv) The result of the
test procedure.
(v) The date, time,
type and duration of the vapor leak rate failure.
(vi) The name of the person correcting the
vapor leak rate failure.
(vii) The
date the vapor leak rate failure was corrected.
(viii) The action taken to correct the vapor
leak rate failure.
(e)
Continuous vapor leak rate
monitoring. The owner or operator of a gasoline dispensing facility
that is continuously monitoring the gasoline dispensing facility Stage I vapor
recovery system piping for vapor leaks under subsection (c)(2) shall design,
install, operate and maintain both of the following:
(1) A Stage I enhanced vapor recovery system
for which a CARB Executive Order is issued, is valid at the time of
installation and remains valid during the operation of the Stage I enhanced
vapor recovery system.
(2) A
continuous pressure monitoring system as identified in Exhibit 1 Section II,
Exhibit 2 Section II and Exhibit 3 Section II of CARB Executive Order VR-202-R,
"Relating to Certification of Vapor Recovery Systems Assist Phase II Enhanced
Vapor Recovery (EVR) System including In-Station Diagnostics (ISD)," dated
December 8, 2014 including updates and revisions. The continuous pressure
monitoring system must meet all of the following:
(i) Include a console, a vapor pressure
sensor, an automatic gasoline storage tank system pressure gauge and vapor leak
rate detection software.
(ii)
Operate at least 95% of the time on a calendar-month basis.
(iii) Calculate and record the percentage of
continuous pressure monitoring system operational time.
(iv) Measure once every 7 days the vapor leak
rate from the gasoline storage tank system at any working ullage pressure, both
positive and negative.
(v) Measure
the gasoline storage tank system pressure once every 7 days.
(vi) Record once every 7 days, with not more
than 7 days between recordings, the calculated percentage of time that the
gasoline storage tank system pressure is at least 0.5 inches of water column
below the positive cracking pressure of the pressure/vacuum vent
valve.
(f)
Stage I vapor recovery system installation requirements. The
owner or operator of a gasoline dispensing facility subject to this section
that installs a Stage I vapor recovery system shall do all of the following:
(1) Perform, and ensure that the Stage I
vapor recovery system passes, all of the following CARB vapor leak rate
monitoring test procedures within 10 days of installation of the Stage I vapor
recovery system:
(i) CARB TP-201.1B if the
Stage I vapor recovery system is equipped with a rotatable adaptor.
(ii) CARB TP-201.1E.
(iii) CARB TP-201.3.
(iv) CARB TP-201.3C.
(2) Record all of the following information,
as applicable, for each test procedure performed under paragraph (1):
(i) The completion date of installation of
the Stage I vapor recovery system.
(ii) The name of the test
procedure.
(iii) The name of the
person performing the test procedure.
(iv) The date the test procedure was
performed.
(v) The result of the
test procedure.
(vi) The date, type
and duration of a vapor leak rate failure.
(vii) The name of the person correcting the
vapor leak rate failure.
(viii) The
date the vapor leak rate failure was corrected.
(ix) The action taken to correct the vapor
leak rate failure.
(3)
Maintain onsite at the gasoline dispensing facility or electronically stored
allowing for onsite examination a copy of the CARB Executive Order specified in
subsection (e)(1).
(4) Install and
maintain a pressure/vacuum vent valve on each atmospheric vent of the
underground storage tank.
(g)
Monitoring the condition of the
Stage I vapor recovery system components and other gasoline dispensing
components. The owner or operator of a gasoline dispensing facility
with a Stage I vapor recovery system shall monitor the condition of the Stage I
vapor recovery system components and other gasoline dispensing components in
accordance with all of the following, as applicable:
(1) Perform an inspection after each gasoline
tank truck delivery to check all of the following:
(i) That each fill pipe adaptor and Stage I
adaptor is tightly sealed.
(ii)
That each Stage I dry break is tightly sealed.
(iii) That each automatic tank gauge cap is
tightly sealed.
(2)
Perform an inspection one time per month to check all of the following:
(i) That each automatic tank gauging
electrical grommet and vent extractor cap is in good working order.
(ii) That the riser and pressure/vacuum vent
valve and cap are installed and not damaged above ground level.
(iii) That there are no tears or holes in
gasoline hoses.
(iv) That gasoline
nozzles are functioning according to their design.
(v) That gasoline hoses are not touching the
ground when the nozzle is resting on its holding bracket.
(vi) That each gasoline nozzle fits in its
holding bracket.
(vii) If a Stage
II vapor balance vapor recovery system is installed, that a face plate can make
a positive seal.
(viii) If a Stage
II vapor balance vapor recovery system is installed, that the bellows are free
of tears and holes.
(3)
Make the needed correction to the Stage I system under paragraph (1) or make
the needed repair to a failed component under paragraphs (1) and (2) as soon as
possible before the next scheduled monthly inspection.
(4) Record all of the following information,
as applicable, for each monitoring inspection conducted under paragraphs (1)
and (2) and for each correction to the Stage I system or repair to a failed
component made under paragraph (3):
(i) The
name of the person performing the inspection.
(ii) The component inspected under paragraphs
(1) and (2).
(iii) The date the
inspection was performed.
(iv) The
result of each inspection of the components under paragraphs (1) and
(2).
(v) The name of the person
making the correction to the Stage I system or the repair to a failed
component.
(vi) The date the
correction was made to the Stage I system or the repair was made to the failed
component.
(vii) The action taken
to correct the Stage I system or to repair the failed component.
(h)
Vapor leak
rate of the gasoline storage tank system. The owner or operator of a
gasoline dispensing facility that is monitoring the vapor leak rate of the
gasoline storage tank system with a continuous pressure monitoring system under
subsection (c)(2) shall do all of the following:
(1) Maintain the gasoline storage tank system
at a vapor leak rate less than two times the allowed vapor leak rate.
(i) The allowed vapor leak rate must be
determined under CARB TP-201.3.
(ii) Equation 9-2 with N=1-6 from CARB
TP-201.3 must be used to determine the allowed vapor leak rate.
(2) Generate a report in
electronic format once per day for the previous calendar day. The report must
record the following:
(i) Continuous pressure
monitoring system operational time as a percentage.
(ii) Percentage of time the tank system
pressure is above atmospheric pressure.
(iii) Percentage of time the tank system
pressure is at least 0.5 inches water column below the positive cracking
pressure of the pressure/vacuum vent valve.
(3) Generate a report in electronic format by
the 15th of the month for the previous calendar month which records the
following:
(i) Continuous pressure monitoring
system operational time as a percentage.
(ii) Percentage of time the tank system
pressure is above atmospheric pressure.
(iii) Percentage of time the tank system
pressure is at least 0.5 inches water column below the positive cracking
pressure of the pressure/vacuum vent valve.
(iv) Warnings generated when the gasoline
storage tank system vapor leak rate equals or exceeds two times the allowed
vapor leak rate determined under subparagraph (1), including the date and time
of each warning.
(4)
Store the electronic records of the reports generated in paragraphs (2) and (3)
in a manner to maintain the records despite loss of power to the continuous
pressure monitoring system.
(5)
Follow the applicable procedures of subsections (i) and (j) if the gasoline
storage tank system vapor leak rate equals or exceeds two times the allowed
vapor leak rate determined under paragraph (1).
(6) Perform, and ensure that the continuous
pressure monitoring system passes, the continuous pressure monitoring system
operability test as specified in Exhibit 9 or Exhibit 10, as applicable, of
CARB Executive Order VR-202-R, one time every 3 years after the date the
continuous pressure monitoring system is installed.
(7) Record all of the following information
for the continuous pressure monitoring system operability test specified in
paragraph (6):
(i) The name of the person
performing the test.
(ii) The date
the test was performed.
(iii) The
result of the test.
(8)
If the continuous pressure monitoring system fails the operability test
required under paragraph (6), the owner or operator shall repair and retest the
continuous pressure monitoring system under paragraph (6) within 10
days.
(9) If the continuous
pressure monitoring system fails the operability test required under paragraph
(6), record all of the following information:
(i) The name of the person recording the
operability test failure.
(ii) The
date and time the continuous pressure monitoring system failed the operability
test.
(iii) The type and duration
of the operability test failure.
(iv) The name of the person correcting the
operability test failure.
(v) The
date the repair was made to correct the operability test failure.
(vi) The action taken to correct the
operability test failure.
(10) Maintain the records required under
paragraphs (7) and (9), as applicable, onsite at the gasoline dispensing
facility or electronically stored allowing for onsite examination for 6
years.
(i)
First
exceedance of the allowed vapor leak rate. If the gasoline storage
tank system vapor leak rate equals or exceeds two times the allowed vapor leak
rate determined under subsection (h)(1), then all of the following must occur:
(1) The continuous pressure monitoring system
must activate a warning alarm and record the event.
(2) The owner or operator shall do all of the
following:
(i) Determine the cause of the
failure and take corrective action within 7 calendar days of the alarm. If this
correction does not require a repair or correction to the gasoline storage tank
system, the person correcting the cause of the failure need not meet the
certification requirements under subsection (q).
(ii) Reset the continuous pressure monitoring
system when the correction under subparagraph (i) is made.
(iii) Record all of the following
information, as applicable, for the exceedance:
(A) The name of the person recording the
vapor leak rate failure.
(B) The
date and time the continuous pressure monitoring system indicated a vapor leak
rate failure.
(C) The type and
duration of the vapor leak rate failure.
(D) The name of the person correcting the
vapor leak rate failure.
(E) The
date the vapor leak rate failure was corrected.
(F) The action taken to correct the vapor
leak rate failure.
(iv)
Record the date, time, duration and reason for a warning alarm that did not
indicate a vapor leak rate failure.
(j)
Second exceedance of the allowed
vapor leak rate. Following the action taken to correct the cause of
the failure under subsection (i)(2)(i), the continuous pressure monitoring
system must recommence monitoring the gasoline storage tank system. If the
gasoline storage tank system vapor leak rate equals or exceeds two times the
allowed vapor leak rate within 7 calendar days following the correction made
under subsection (i)(2)(i), then all of the following must occur:
(1) The continuous pressure monitoring system
must activate a warning alarm and record the event.
(2) The owner or operator of the gasoline
dispensing facility shall do all of the following:
(i) Reset the continuous pressure monitoring
system as soon as the vapor leak rate failure is corrected.
(ii) Determine the cause of the failure and
take corrective action within 7 calendar days of the alarm.
(A) The person correcting a failure to the
gasoline storage tank system must meet the certification requirements under
subsection (q).
(B) The person
correcting a failure to the continuous pressure monitoring system must meet the
certification requirements under subsection (q) or must be authorized to make
repairs by the continuous pressure monitor manufacturer.
(iii) Record all of the following
information, as applicable, for the exceedance:
(A) The name of the person recording the
vapor leak rate failure.
(B) The
date and time the continuous pressure monitoring system indicated a vapor leak
rate failure.
(C) The type and
duration of the vapor leak rate failure.
(D) The name of the person correcting the
vapor leak rate failure.
(E) The
date the vapor leak rate failure was corrected.
(F) The action taken to correct the vapor
leak rate failure.
(k)
Low permeation hoses and enhanced
conventional nozzles. An owner or operator of a gasoline dispensing
facility that is subject to this section and does not have a Stage II vapor
recovery system shall do all of the following:
(1) Install and maintain low permeation hoses
on each gasoline dispenser at the gasoline dispensing facility as follows:
(i) For a gasoline dispensing facility in
operation on or before March 26, 2022, install low permeation hoses by March
26, 2024, on each gasoline dispenser that is located at the gasoline dispensing
facility as of March 26, 2022.
(ii)
For a gasoline dispenser installed after March 26, 2022, install low permeation
hoses described in subparagraph (iv) upon installation of the gasoline
dispenser.
(iii) For a gasoline
dispensing facility that begins operation after March 26, 2022, install low
permeation hoses described in subparagraph (iv) upon installation of each
gasoline dispenser.
(iv) For
subparagraphs (i) through (iii), the owner or operator may only install low
permeation hoses that are included by the CARB Executive Officer on the Exhibit
1 "Component List" in CARB Executive Order NVR-1-D, "Relating to Certification
of Non-Vapor Recovery Hoses and Enhanced Conventional Nozzles, For Use at
Gasoline Dispensing Facilities with No Phase II Vapor Recovery Systems,"
executed March 1, 2019, including updates and revisions.
(2) Install and maintain enhanced
conventional nozzles on each gasoline dispenser as follows:
(i) The owner or operator shall replace each
conventional nozzle with an enhanced conventional nozzle within 2 years after
the Department publishes notice in the Pennsylvania Bulletin
of the CARB Executive Officer having issued an Executive Order of Certification
to a second manufacturer for an enhanced conventional nozzle.
(ii) For a gasoline dispenser installed at
the gasoline dispensing facility after the Department publishes the
Pennsylvania Bulletin notice referenced in subparagraph (i),
the owner or operator of the gasoline dispensing facility shall install
enhanced conventional nozzles.
(iii) For a gasoline dispensing facility that
begins operating after the Department publishes the notice in the
Pennsylvania Bulletin referenced in subparagraph (i), the
owner or operator of the gasoline dispensing facility shall install enhanced
conventional nozzles on each gasoline dispenser.
(iv) For subparagraphs (i) through (iii), the
owner or operator may only install enhanced conventional nozzles that are
included by the CARB Executive Officer on the Exhibit 1 "Component List" in
CARB Executive Order NVR-1-D, "Relating to Certification of Non-Vapor Recovery
Hoses and Enhanced Conventional Nozzles, For Use at Gasoline Dispensing
Facilities with No Phase II Vapor Recovery Systems," executed March 1, 2019,
including updates and revisions.
(l)
Additional requirements for
gasoline dispensing facilities. The owner or operator of a gasoline
dispensing facility subject to this section shall do all of the following:
(1) Provide necessary maintenance and make
modifications to the vapor control system of the gasoline dispensing facility
necessary to comply with the applicable requirements of this section.
(2) Provide adequate training and written
instructions to the operator of the gasoline dispensing facility to ensure
proper operation of the vapor control system.
(3) Maintain onsite at the gasoline
dispensing facility or electronically stored allowing for onsite examination a
copy of the training schedule and written instructions required under paragraph
(2).
(4) Immediately remove from
service and tag a defective nozzle or other component of the gasoline
dispensing system until the defective component is replaced or repaired.
(i) A component removed from service may not
be returned to service until the defect is corrected.
(ii) If the Department finds during an
inspection that a defective nozzle or other component of the gasoline
dispensing system is not properly tagged, the component may not be returned to
service until the defect is corrected and the Department approves its return to
service.
(5)
Conspicuously post the operating instructions for the gasoline dispensing
system in the gasoline dispensing area. The operating instructions must
include, at a minimum, all of the following information:
(i) A clear description of how to correctly
dispense gasoline with the nozzles used at the site.
(ii) A warning that continued attempts to
dispense gasoline after the gasoline dispensing system indicates that the motor
vehicle fuel tank is full may result in spillage and contamination of the air
or water or recirculation of the gasoline into the vapor recovery
system.
(iii) A telephone number,
email address or social media account established by the Department for the
public to use to report problems experienced with the gasoline dispensing
system.
(m)
Recordkeeping and reporting requirements. The owner or
operator of a gasoline dispensing facility subject to this section that creates
a record under subsection (d)(2), (f)(2), (g)(4), (h)(4), (h)(10), (i)(2)(iii)
or (j)(2)(iii) shall do both of the following:
(1) Maintain the required records onsite at
the gasoline dispensing facility or electronically stored allowing for onsite
examination for 2 years, unless specified otherwise in this section or unless a
longer period is required under Chapter 127 (relating to construction,
modification, reactivation and operation of sources) or a plan approval,
operating permit, consent decree or order issued by the Department.
(2) Submit the records to the Department in
an acceptable format upon receipt of a request from the Department.
(n)
Record certifying the
Stage I enhanced vapor recovery system. An owner or operator
proceeding under subsection (c)(2) shall maintain onsite at the gasoline
dispensing facility or electronically stored allowing for onsite examination a
copy of the valid CARB Executive Order required under subsection (e)(1) for the
duration of the operation of the Stage I enhanced vapor recovery system. The
copy must be made available to the Department upon receipt of a
request.
(o)
Record
certifying the low permeation hoses and enhanced conventional nozzles.
The owner or operator shall maintain onsite at the gasoline dispensing facility
or electronically stored allowing for onsite examination a copy of the CARB
Executive Order required under subsection (k)(1) and (2) for the duration of
the use of the low permeation hoses and enhanced conventional nozzles,
respectively. The copy must be made available to the Department upon receipt of
a request.
(p)
Record of
training schedule and written instructions. The owner or operator
shall maintain onsite at the gasoline dispensing facility or electronically
stored allowing for onsite examination a copy of the training schedule and
written instructions required under subsection (l)(2) for the duration of the
operation of the vapor control system. The copy must be made available to the
Department upon receipt of a request.
(q)
Certification requirements for a
person who performs underground storage tank system installation or
modification work.
(1) The owner and
operator of a gasoline dispensing facility subject to this section shall ensure
that a person who performs underground storage tank system installation or
modification work under this section is appropriately certified for the work
they perform, as follows:
(i) The person must
be a certified UMI or UMX storage tank installer under Chapter 245, Subchapter
A (relating to general provisions).
(ii) The person must comply with the
applicable requirements of Chapter 245, Subchapter B (relating to certification
program for installers and inspectors of storage tanks and storage tank
facilities).
(2) A person
only performing a test specified under subsection (b) is not required to be
certified under this subsection.