(a) The owner or
operator of a Portland cement kiln shall maintain an operating log for each
Portland cement kiln. The operating log must include the following on a monthly
basis:
(1) The total hours of
operation.
(2) The type and
quantity of fuel used.
(3) The
quantity of clinker produced.
(b) The records maintained by the owner or
operator of a Portland cement kiln must include the following:
(1) Source tests and operating parameters
established during the initial source test and subsequent testing.
(2) The date, time and duration of any
start-up, shutdown or malfunction of a Portland cement kiln or emissions
monitoring system.
(3) The date and
type of maintenance, repairs or replacements performed on the kilns, control
devices and emission monitoring systems.
(c) The owner or operator of a Portland
cement kiln shall maintain the records required under this section onsite for 5
years. The records shall be made available to the Department upon request.
Notes
The
provisions of this § 145.146 adopted June 18, 2010, effective
6/19/2010, 40 Pa.B.
3346.
The provisions of this § 145.146 issued under
section 5(a)(1) of the Air Pollution Control Act (35 P.S. §
4005(a)(1)).
This section cited in 25 Pa. Code §
129.97 (relating to presumptive
RACT requirements, RACT emission limitations and petition for alternative
compliance schedule); and 25 Pa. Code §
129.112 (relating to presumptive
RACT requirements, RACT emission limitations and petition for alternative
compliance schedule).