25 Pa. Code § 283.232 - Soil erosion and sedimentation control
The operator shall manage surface water and control erosion and sedimentation to:
(1) Divert surface water away from the storage area with measures and structures necessary to handle surface water flows, based on a 25-year, 24-hour precipitation event, supported by written calculations and also in compliance with Chapter 102 (relating to erosion and sediment control).
(2) Meet the requirements of Chapter 102 and Chapter 105 (relating to dam safety and waterway management).
(3) Prevent erosion to the maximum extent possible, including if possible, using revegetation.
Notes
This section cited in 25 Pa. Code § 283.213 (relating to access roads).
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.