25 Pa. Code § 77.593 - Alternatives to contouring
Alternative reclamation to approximate original contour may be authorized as follows:
(1) The applicant shall demonstrate that the
proposed operation will be carried out over a substantial period of time and
that the volume of mineral to be removed is large compared to the overburden to
restore the area to approximate original contour. The applicant shall provide a
description of the alternative and demonstrate that:
(i) The alternative to contouring can be
achieved.
(ii) The alternative
poses no actual or potential threat to public health or safety.
(iii) The alternative poses no actual or
potential threat to water diminution, contamination, interruption or
pollution.
(iv) The alternative is
consistent with applicable land use policies, plans and programs.
(v) The alternative is consistent with
Federal, State or local law.
(vi)
The alternative is the highest or best use that can reasonably be supported
after mining and reclamation is completed.
(2) If the applicant does not meet the
requirements of paragraph (1), an alternative to contouring may be authorized
if the applicant demonstrates that the operation will either restore the land
affected to a condition capable of supporting the uses it was capable of
supporting prior to mining or to a higher or better use. The applicant shall
demonstrate that:
(i) The alternative is
acceptable to the landowner.
(ii)
Highwalls will not remain after mining.
(iii) The watershed of the area will be
improved.
(iv) The proposed use has
been designed and certified by a registered professional engineer to assure the
stability, drainage and configuration necessary for the intended use of the
site.
(v) A demonstration that the
alternative to contouring is likely to be achieved or that the alternative
poses no actual or potential threat to public health or safety or of water
diminution, interruption, contamination or
pollution.
Notes
This section cited in 25 Pa. Code § 77.594 (relating to final slopes); and 25 Pa. Code § 77.595 (relating to concurrent reclamation).