25 Pa. Code § 78.83c - Intermediate and production casing
(a) Prior to cementing the intermediate and
production casing, the borehole, mud and cement shall be conditioned to ensure
an adequate cement bond between the casing and the formation.
(b) If the well is to be equipped with an
intermediate casing, centralizers shall be used and the casing shall be
cemented to the surface by the displacement method. Gas may be produced off the
intermediate casing if a shoe test demonstrates that all gas will be contained
within the well and a relief valve is installed at the surface that is set less
than the shoe test pressure. The shoe test pressure shall be recorded in the
completion report.
(c) Except as
provided in §
78.83 (relating to surface and
coal protective casing and cementing procedures), each well must be equipped
with production casing. The production string may be set on a packer or
cemented in place. If the production casing is cemented in place, centralizers
shall be used and cement shall be placed by the displacement method with
sufficient cement to fill the annular space to a point at least 500 feet above
true vertical depth or at least 200 feet above the uppermost perforations,
whichever is greater.