25 Pa. Code § 78a.68 - Oil and gas gathering pipelines
(a)
The requirements of this section apply to all earth disturbance activities
associated with oil and gas gathering pipeline installations and supporting
facilities including the construction right-of-way, work space areas, pipe
storage yards, borrow and disposal areas, access roads and other necessary
areas identified on the erosion and sediment control plan. The construction,
installation, use, maintenance, repair and removal of oil and gas gathering
pipelines under this section shall be conducted in accordance with Chapters 102
and 105 (relating to erosion and sediment control; and dam safety and waterway
management).
(b) Highly visible
flagging, markers or signs shall be used to identify the shared boundaries of
the limit of disturbance, wetlands and locations of threatened or endangered
species habitat prior to land clearing. The flagging, markers or signs shall be
maintained throughout earth disturbance activities and restoration or PCSM
activities.
(c) The operator shall
maintain topsoil and subsoil during excavation under the following, unless
otherwise authorized by the Department:
(1)
Topsoil and subsoil must remain segregated until restoration.
(2) Topsoil and subsoil must be prevented
from entering watercourses and bodies of water.
(3) Topsoil cannot be used as bedding for
pipelines.
(4) Native topsoil and
imported topsoil must be of equal or greater quality to ensure the land is
capable of supporting the uses that existed prior to earth
disturbance.
(d)
Backfilling of the gathering pipeline trench shall be conducted in a manner
that minimizes soil compaction at the surface to ensure that water infiltration
will be sufficient to support the establishment of vegetative growth to meet
stabilization or restoration requirements.
(e) Equipment may not be refueled within the
floodway or within 50 feet of any body of water.
(f) Materials staging areas must be located
outside of a floodway or greater than 50 feet from any body of water, unless
otherwise approved in writing by the Department.
(g) All buried metallic gathering pipelines
shall be installed and placed in operation in accordance with 49 CFR Part 192,
Subpart I or Part 195, Subpart H (relating to requirements for corrosion
control; and corrosion control).
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.