25 Pa. Code § 83.282 - Summary of plan
(a) The plan must
contain a summary that includes:
(1) A manure
summary table listing:
(i) The total amount of
manure planned to be generated on the operation annually.
(ii) The total amount of manure planned to be
used on the operation annually.
(iii) The total amount of manure planned to
be exported from the operation annually.
(2) A nutrient application summary
documenting the planned nutrient applications for each crop management unit
listing:
(i) Acres.
(ii) Expected yield.
(iii) Nutrients applied as starter chemical
fertilizer.
(iv) Planned manure
application period.
(v) Planned
manure application rate and type of manure to be applied.
(vi) Planned manure incorporation
time.
(vii) Rate of other organic
nutrient sources planned to be applied.
(viii) Other nutrients applied through
chemical fertilizer.
(ix) Other
comments or notes.
(3)
General procedures and provisions for the utilization or proper disposal of
excess manure.
(b) The
summary must include the following information on planned BMPs:
(1) Planned manure management and storage
practices, stormwater runoff control practices and other appropriate BMPs
necessary to protect the quality of surface water and groundwater.
(2) The schedule for implementation of the
planned BMPs.
(3) The locations of
planned BMPs on the agricultural operation.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.