25 Pa. Code § 83.321 - Stormwater control
(a) In the
preparation of a nutrient management plan under this subchapter, the nutrient
management specialist shall conduct a review of the adequacy of existing
stormwater control practices on croplands, haylands and pastures included in
the plan to prevent nutrient pollution of surface water and groundwater. The
specialist may confer with NRCS, conservation district staff or others with
expertise with nutrient runoff control. Based on this review, the plan must
identify critical runoff problem areas.
(b) The nutrient management plan shall
contain a list of specific stormwater control BMPs to address those critical
runoff problem areas identified in the review required under subsection (a).
This list of stormwater control BMPs may not be in conflict with other relevant
plans developed for the operation, such as the agricultural erosion and
sediment control plan, unless otherwise approved by the Commission or delegated
conservation district.
(c) The plan
submitted for approval is not required to include BMP designs. During the
implementation of the approved plan, the operator is responsible for obtaining
the necessary BMP designs and associated operation and maintenance plans to
implement the BMPs listed in the approved plan, and these BMP designs and
associated operation and maintenance plans shall be kept on record by the
operator as a supplement to the nutrient management plan.
(d) BMPs listed in the plan to address
critical runoff problem areas shall be selected, designed, installed, operated
and maintained to prevent nutrient pollution of surface water and groundwater.
The BMPs contained in the Pennsylvania Technical Guide may be
used to meet this requirement. Other BMPs shall be approved by the Commission.
(e) For areas on land rented or
leased by the operator that have been identified as critical runoff problem
areas which will require the installation of BMPs requiring construction
activities, the operator shall do one of the following:
(i) Implement the listed BMP.
(ii) Enter into an agreement with the
landowner requiring the landowner to implement the
BMP.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.