25 Pa. Code § 87.146 - Regrading or stabilizing rills and gullies

(a) Exposed surface areas shall be protected and stabilized to effectively control erosion and air pollution attendant to erosion.
(b) Rills and gullies, which form in areas that have been regraded and topsoiled and which do one of the following shall be filled, regraded or otherwise stabilized:
(1) Disrupt the approved postmining land use or the reestablishment of the vegetative cover.
(2) Cause or contribute to a violation of water quality standards for receiving streams.
(c) For the areas listed in subsection (b), the topsoil shall be replaced and the areas shall be reseeded or replanted.

Notes

25 Pa. Code § 87.146
The provisions of this § 87.146 adopted December 19, 1980, 10 Pa.B. 4789, effective 7/31/1982, 12 Pa.B. 2382; amended July 30, 1982, 12 Pa.B. 2473, effective 7/31/1982, 12 Pa.B. 2382; amended June 15, 1990, 20 Pa.B. 3383, effective 7/27/1991, 21 Pa.B. 3316; amended May 8, 1998, effective 5/9/1998, 28 Pa.B. 2227.

This section cited in 25 Pa. Code § 87.140 (relating to contemporaneous reclamation); and 25 Pa. Code § 87.174 (relating to steep slope operations).

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.