(a) To establish the alternative effluent
limitations of Group B or C in §
88.92(a)
(relating to hydrologic balance: effluent standards), a permittee shall
demonstrate to the Department's satisfaction that a precipitation event has
occurred, under the procedures in this section.
(1) The occurrence of a precipitation event
greater than a 10-year, 24-hour precipitation event may be demonstrated by
meeting the requirements of subsections (b)-(d) for each discharge that exceeds
the effluent limits specified in §
88.92, unless the permit specifies
a more stringent water quality based effluent limitation, in which case no
exemption will be available under this section. If the permittee demonstrates
to the Department's satisfaction that a greater than 10-year, 24-hour
precipitation event has occurred, the permittee shall meet the effluent
limitation of Group C in §
88.92(a).
(2) The occurrence of a precipitation event
equal to or less than a 10-year, 24-hour precipitation event may be
demonstrated by meeting the requirements of subsections (c) and (d) for each
discharge that exceeds the effluent limits specified in §
88.92, unless the permit specifies
a more stringent water quality based effluent limitation, in which case no
exemption will be available under this section. If the permittee demonstrates
to the Department's satisfaction that a precipitation event equal to or less
than a 10-year, 24-hour precipitation event has occurred, the permittee shall
meet the effluent limitations of Group B in §
88.92(a).
(b) The 10-year, 24-hour precipitation event
for specific areas in this Commonwealth shall be determined by reference to
data provided by the National Oceanic and Atmospheric Administration or
equivalent resources.
(c) For the
permittee to demonstrate that the 10-year, 24-hour precipitation event has for
his mine area been exceeded, or that dry weather flow conditions did not exist,
the permittee shall do one of the following:
(1) Collect 24-hour rainfall information from
all official United States Weather Bureau Stations within a 25-mile distance
radius of the site. By appropriate interpolation of the data collected under
this paragraph, calculate the estimated rainfall event for the site.
Appropriate interpolation shall be accomplished by:
(i) Construction of an isohyetal map in
accordance with the guidelines established by the Department.
(ii) Linear interpolation between the
isohytes.
(2) Prepare a
verified copy of the chart or readout from a Department approved flow measuring
device which continuously records the influent to the permitted treatment
facility. The device shall be approved by the Department in writing prior to
the event for which the exemption is sought and shall be secure to prevent
tampering and acts of third parties.
(3) Prepare an analysis identifying the
runoff area tributary to the treatment facility, and compare the actual runoff
as measured and depicted by the flow measuring device with the runoff expected
from the 10-year, 24-hour precipitation event for the mine area.
(4) Develop alternative documentation or data
concerning the precipitation event. The method or system for developing the
documentation or data shall be approved in writing prior to the occurrence of
the event for which the exemption is being sought, and shall guarantee the
integrity of the information collected.
(d) When the discharge from the site exceeds
any effluent limit in the permit, the permittee shall notify the Department
within 5 days of the occurrence of the event that he is applying for an
exemption from that limit and shall within 30 days thereafter provide to the
Department:
(1) The data required by
subsection (c).
(2) A showing that
the facility from which the discharge occurred was designed, maintained and
operated during and prior to the event to accommodate or treat a 10-year,
24-hour precipitation event.
(e) The permittee is not entitled to claim a
greater than 10-year, 24-hour precipitation event storm exemption unless the
permittee has complied with subsections (c) and (d).
(f) Nothing in this section authorizes the
Department to grant an exemption for a discharge which the Department finds may
have caused or contributed to a violation of general or specific water quality
criteria in Chapter 93 (relating to water quality
standards).
Notes
The
provisions of this § 88.93 adopted December 19, 1980, 10 Pa.B. 4789,
effective 7/31/1982, 12 Pa.B.
2382; amended March 30, 1984, 14 Pa.B. 1143, effective
8/10/1985, 15 Pa.B. 2872;
amended June 15, 1990, 20 Pa.B. 3383, effective 7/27/1991, 21 Pa.B. 3316; amended March 13,
2020, effective 3/14/2020, 50
Pa.B. 1508.
The provisions of this § 88.93 amended under
section 5 of The Clean Streams Law (35 P.S. §
691.5); sections 4(a) and 4.2 of the Surface
Mining Conservation and Reclamation Act (52 P.S.
§§
1396.4(a) and
1396.4b); section 3.2 of the
Coal Refuse Disposal Control Act (52 P.S. §
30.53b); section 7(b) of The Bituminous Mine
Subsidence and Land Conservation Act (52 P.S. §
1406.7(b)); and section
1920-A of The Administrative Code of 1929 (71 P.S. §
510-20).
This section cited in 25 Pa. Code §
88.92 (relating to hydrologic
balance: effluent standards).