52 Pa. Code § 69.1903 - Preparation and response measures
(a)
EDC liaisons to
counties. An electric distribution company (EDC) should offer a
company liaison to counties (County Emergency Operations Centers or 9-1-1
Centers, depending on the county's preference) in its service territory that
are significantly impacted, meaning those with at least 10% of customers in the
county experiencing an outage for over 48 hours, during high-impact and major
service outage events such as those listed in subsection (b)(1).
(1) An EDC should inform the Commission's
Lead Emergency Preparedness Liaison Officer (EPLO) of the counties in which the
company has placed liaisons when this information is available.
(2) The threshold for when a company liaison
is offered should be determined in agreement with the counties.
(3) A county may request a company liaison
for events that do not meet the established threshold subject to operational
constraints.
(4) An EDC should make
a best effort to respond to a county's request for a company liaison under
paragraph (3), subject to operational and safety considerations.
(5) In a county served by more than one EDC,
the EDCs should coordinate their response to the county so that the county has
representation from the desired EDCs.
(6) An EDC should meet at least yearly with
each county to review the liaison program and other emergency response
issues.
(b)
EDC
regional conference calls. An EDC should offer regional conference
calls for State and local elected officials and local emergency managers for
major service outage events.
(1) Examples of
major service outage events include:
(i)
Hurricanes.
(ii) Tropical
storms.
(iii) Major
flooding.
(iv) Ice
storms.
(v) Heavy snows.
(vi) Cybersecurity incidents.
(2) Regions should be determined
based on the geographic locations affected by the major service outage
event.
(3) An EDC should begin
conference calls prior to an expected major service outage event and should
offer to continue the conference calls daily as warranted by the needs of the
parties on the calls.
(4) An EDC
should ensure participants on the conference call have the required call-in
information prior to initiating the calls.
(5) EDCs should work together to share best
practices on how to structure and manage the regional conference calls,
especially in those areas that are served by multiple EDCs.
(6) An EDC should notify the Commission's
Lead EPLO when initiating regional conference calls.
(c)
EDC storm exercises. An
EDC should develop and hold a storm restoration exercise at least once each
calendar year.
(1) An EDC should notify the
counties and other utilities in its service territory of the dates and times of
storm restoration exercises at least 3 weeks in advance, if possible.
(2) An EDC should invite counties in its
service territory to participate in its storm restoration exercises.
(3) An EDC that has a large service territory
may hold several smaller-scale exercises on a regional level.
(4) An EDC should inform the Commission's
Lead EPLO of the dates and times of its storm restoration exercises.
(5) An EDC should review its exercise After
Action Reports with the Commission, including corrective actions or best
practice implementations planned as a result.
(d)
EDC outage web sites.
(1)
Large EDCs. A large EDC,
as defined in §
57.195(b)
(relating to reporting requirements), should have an outage information section
or portal on its web site. The outage information should be updated on a
periodic basis of at least once per hour. The outage section or portal should
provide one of the following as technology permits:
(i) A graphic outage map of the service
territory with county boundaries clearly defined that shows current service
outages for the entire service territory and current outages in each county
using text, colors or some other means. The outage map should:
(A) Allow users to click on a specific county
and view the total number of customers out of service for the county.
(B) Indicate the current number of customers
out of service by municipality or borough.
(C) Provide estimated times of restoration
when available.
(D) Include the
number of customers served in each county and municipality or
borough.
(ii) A summary
tab that allows users to view the total number of customers out of service for
the municipality or borough in each county along with an option to view the
total number of customers out of service for the municipality or borough in
each county along with estimated times of restoration, when available, and the
number of customers served in each county and municipality or
borough.
(2)
Small EDCs. A small EDC, as defined in §
57.195(c), should
provide an outage section on its web site that provides:
(i) Outage and estimated restoration
information by county and municipality or borough for service outages that meet
the reporting criteria as defined in §
67.1(b) (relating
to general provisions).
(ii) Outage
and estimated restoration information, updated at least twice daily, and noting
the next update time for each posting.
(3)
Duration. Outage
information for large and small EDCs should be provided until the last
customer's service affected by the outage event is restored.
(e)
EDC major service
outage event after action reviews. After major service outage events
as defined in subsection (b)(1), an EDC should:
(1) Coordinate after action reviews with
other EDCs through the EDC Best Practices Working Group and solicit input from
each significantly impacted county and other utilities as to the EDC's
performance during the event and suggested improvements or comments on
successful initiatives.
(2) The EDC
Best Practices Working Group should report to the Commission on best practices
identified and areas for improvement along with a timeline of implementation of
those best practices and corrective actions for the areas of improvement. The
best practices report should be reported to the Commission within 1 calendar
year of the major service outage event's occurrence.
(f)
EDC storm outage prediction
models. An EDC should develop a storm damage and outage prediction
model.
(1) A storm outage prediction model
should be a means for an EDC to estimate expected storm damage and the
potential number of service outages given inputs such as weather data, service
territory geography/topography, historical data on similar storms, customer
density and other relevant factors.
(2) An EDC should provide the Commission with
an overview of its model when it is completed. An EDC is encouraged to work
together with other EDCs throughout the county and with academic institutions
to develop its prediction model.
(3) An EDC that already has a working model
is encouraged to share its best practices with other EDCs while respect is
given to proprietary elements in its model.
(4) An EDC should provide an overview of its
developed and implemented model to the Commission and county emergency managers
in its service territory.
(5) An
EDC should provide the Commission's Lead EPLO with its model's predictions
prior to expected major service outage events as defined in subsection
(b)(1).
(g)
EDC
estimated time of restoration messaging. An EDC should continue its
work on improving the process of providing timely and accurate estimated times
of restoration during service outages, especially during major service outage
events as defined in subsection (b)(1).