52 Pa. Code § 69.2104 - Interconnection application fees
The following fee structures and fees will be deemed appropriate for use by electric distribution companies when processing interconnection applications filed under § § 75.21, 75.22, 75.31-75.40 and 75.51 (relating to interconnection standards):
(1)
Level 1
applications-$100. If an application is denied because it does not
meet the requirements of a Level 1 review, and the applicant resubmits the
application under another review procedure in accordance with this title, the
electric distribution company may impose a fee for the incremental expense
attributable to the resubmitted application consistent with the fees
established for the new level of review.
(2)
Level 2 applications.
Base fee of $250 plus $1 per kW of the nameplate capacity rating of the
customer-generator's facility, plus the cost of any minor modifications to the
electric distribution company's distribution system or additional review if
required under §
75.38 (relating to Level 2
interconnection review). Costs for minor modifications or additional review
must be based on electric distribution company estimates and must be subject to
review by the Commission at the request of either party. Costs for engineering
work done as part of any additional review should not exceed $100 per hour. If
an application is denied because it does not meet the requirements of a Level 2
review, and the applicant resubmits the application under another review
procedure in accordance with this title, the electric distribution company may
impose a fee for the incremental expense attributable to the resubmitted
application consistent with the fees established for the new level of
review.
(3)
Level 3
applications. Base fee of $350 plus $2 per kW of the nameplate
capacity rating of the customer-generator's facility, plus the cost of any
feasibility studies, system impact studies or facilities studies required under
§
75.39 (relating to Level 3
interconnection review). Costs for engineering work done as part of a
feasibility study, system impact study or facilities study should not exceed
$100 per hour. If the electric distribution company must install facilities to
accommodate the interconnection of the customer-generator facility, the cost of
the facilities shall be the responsibility of the customer-generator. If an
application is denied because it does not meet the requirements of a Level 3
review, and the applicant resubmits the application under another review
procedure in accordance with this title, the electric distribution company may
impose a fee for the incremental expense attributable to the resubmitted
application consistent with the fees established for the new level of
review.
(4)
Level 4
applications. In those instances when a Level 4 application is
processed using the Level 1, Level 2 or Level 3 review process, the fees set
forth for those particular review levels should apply. A fee may not be
assessed for an area network impact study conducted under §
75.40 (relating to Level 4
interconnection review). A Level 4 application reviewed under §
75.40(d) should
be subject to a base fee of $350 plus $2 per kW of the nameplate capacity
rating of the customer-generator's facility. If an application is denied
because it does not meet the requirements of a Level 4 review, and the
applicant resubmits the application under another review procedure in
accordance with this title, the electric distribution company may impose a fee
for the incremental expense attributable to the resubmitted application
consistent with the fees established for the new level of review.