Tenn. Comp. R. & Regs. 0400-52-07-.01 - CASING REQUIREMENTS
(1) Surface Casing
(a) The operator shall set surface casing at
100 feet below the lowest known fresh water aquifer. The Supervisor shall have
the authority to require distances of less than 100 feet upon specific request
from the operator if adequate technical justification can be made. The operator
shall use casing that has an external collapse pressure rating great enough to
handle the hydrostatic pressure of a class A cement from the casing shoe to
surface and internal pressure rating to handle any anticipated down hole
pressures. The operator shall use cement with a minimum 500 psi compressive
strength and will allow a minimum of 8 hour wait, or until the cement has
adequately set, prior to drilling the shoe out. Surface casing shall be used to
protect fresh water aquifers. No casing shoe shall be drilled until a cement
seal has been brought back to the surface and secured between the surface
casing and the well bore, preventing any ground water contamination.
(b) In non-Cumberland Plateau wells in areas
of known lower pressures, the operator shall set all surface casing 100 feet
below the fresh water. The Supervisor shall have the authority to require
distances less than 100 feet upon specific request from the operator if
adequate technical justification can be made. The operator shall use casing
with an external collapse pressure rating great enough to handle the
hydrostatic pressure of a class A cement from the casing shoe to surface. A
Float shoe or Baffle or Guide shoe with Wiper Plug along with annular cement
volume plus 35% excess shall be required on all surface casing cement jobs.
Cement shall have a minimum 500 psi compressive strength and have a minimum 8
hour wait, or longer if needed to ensure that cement has adequately set, prior
to drilling the shoe out. No casing shoe shall be drilled until a cement seal
has been brought back to the surface and secured between the surface casing and
the well bore, preventing any ground water contamination. The operator shall
present all cement and casing designs on a specifications sheet with permit
application for approval.
(2) If intermediate casing is used, the
operator shall set an intermediate string of casing prior to drilling into any
known oil and gas producing zone. Casing shall have a minimum internal pressure
rating of 110% of maximum formation pressure reasonably expected based on the
depth and location of the well. The operator shall cement the intermediate
casing at a minimum of 100 feet into the surface casing. Casing string shall be
deep enough to prevent underground blowout from anticipated bottomhole
pressures. Casing shall have an external collapse pressure rating to handle
cement design from casing shoe to surface. The operator shall use cement with
500 psi compressive strength and have a minimum 8 hour wait, or until cement
has adequately set, prior to drilling the shoe out..
(3) The operator shall present all cement and
casing designs on a specifications sheet with permit application for approval.
A copy of cement tickets shall be kept on location to be viewed by the
inspector until the drill rig is removed. In unknown or over pressured
conditions a 5000 psi rating on casing shall apply. The operator shall attach a
copy of all cement tickets to the well history tickets and shall include all
volumes and pressures of job from start to finish. To ensure adequate annular
space for cementing, the annular space outside the casing shall be at least as
large as follows for the applicable casing size:
Up to 7" Outside Diameter (O.D.) Casing O.D. + 1 1/2"
More than 7" and less than 10 3/4" O.D. Casing O.D. + 2"
More than 10 3/4 "O.D. Casing O.D + 3"
(4) Any wells on the Cumberland Plateau
drilled to depths above the Chattanooga Shale may be eligible for variances on
the casing requirements in this rule by making a specific request to the
Supervisor.
Notes
Authority: T.C.A ยงยง 60-1-201 et seq., and 4-5-201 et seq.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.